Deficiency in Axial Power Distribution Monitoring Sys Resolved by Westinghouse Lowering Input Values
ML19263C325
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/16/1979
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7902210249
Download: ML19263C325 (1)


Text

--

.e c

Ve co'-

VIRGINIA ELECTRIC AND PCMER COMPANY February 16, 1979 Mr. ' James P.~.0'Refily, Director Serial No~. 575B Office Inspection & Enforcement PSELC/LCK:LO914

~

U. S. ' Nuclear Regulatory Commission Region 11 Docket Ho. 50-339

-101 Marietta Street,- Suite 3100.

-Atlanti, Caorgia' 30303

Dearfrk.O'Reilly:

In accordance with'10CFR50.55(e), the NRC, Region II, was_ notified on October 6,1974 that-the North Anna Unit.2 Axial' Power Distribution Honitoring System (APDb15) provided by Westinghouse Electric Corporation contsined 'a non-conservatism

~

capable. of causing in error in the calculation of LOCA peaking factor shape limitsc This error was caused by a: calculational round off which increased the set point above the. desired value by as much as 1.1%.

This deficiency will be correctea by implementing an administrative procedure 3

wMch lowers the inputEvalues used by the APDNS 1.5% in order to accunodate the no_n-conservatism in the limit setpoint, values calculated by the APDMS.

This administrative procedure,is presently being used on North Anna Unit 1.

(It.should also$ba mentioned that-safe. operation of -the' unit could continue without AP0 tis since full backup capability is provided on the unit's P250 plant computer 1 system or by manual calculations.s -This backup capability is provided in accordance with the proposed horth Anna Unit 2 Technical Specifications Section

~

4.2.6.

s.

Sir.ce this deficiency has now been conservatively taken into account, and since alternate acceptable means~ of performing axial power distribution surveillance are available, It ~is considered that this item is. resolved.

We consider this to be the final report under the;provisiens of 10CFRS50.55(e).

If you require any further information at this time, please contact us.

ery, ly rs, j' /

[

/ /

/

..C! brin,l l rl.&p l_

/>

~

/

Senior Vic/ President - Potyar/ Station s

.Enginpering and Constr ion

[Mr. John G.l Davis, Acting Director cc:

Ofh e of Inspection i Enforcement 4 -

..b

.k.r. Harold R. Denton, Director.

\\

Office of' Nuclear ~ Reactor Regulation 9

s 17 9 0. 2 2'10.M7 y

,