Text
o OPEltAllNG DATA Ill.I' ORT DOCKET NO.50-20G DATE 2-1-79 C. Conne11 COMPl.ETED ltY TELEPilONE UJ14) 7 3'J-0200 OPER ATING STATilS
'i Notes 3 Nuclear Power Plant
- 1. Unit Name: Jn'!i na Point t!o.
Januarv
- 2. Reporting Period: _
_3025
- 3. Licensed Thennal Power D1Wt):
1013
- 4. Nameplate Rating (Grow 31We):
"66
- 5. Design Electrical Ratin;;(Net SIWel:
1000
- 6. Maximum Dependable Capacity (Gross MWe):
9F'
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
None NA
- 9. Power Lese!To Which Restricted,If Any (Net MWel:
None
- 10. Reasons For Restrictions.lf Any:
This Month Yr to.Date Cumulative 744 744 21,241
- 11. Ilours in Reporting Period 732.4 16,393.34 732.4
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown Hours 724.0 15,931.7 794 n
- 14. Ilours Generator On-Line 0
0 0
2,114,526 2,114,526_
42,365,695
- 15. Unit Reserve Shutdown Hours 709,730 14,092,501
- 16. Cross Thermal Energy Generated (MWH) 709,73,0_
- 17. Cross Efeetrical Energy Generated OlWHI 685.847 13.534,657 60A 947
- 18. Net Electrical Energy Generated (MWil) 97.3 75.0 97.3 75.0
- 19. Unit Senice f actor 97.3 97.3 5.5 66.0
- 20. Unit Availability Factor "9
s
- 21. Unit Capacity Factor (Using MDC Net)
- os_s 6 6. c_.,
on <
- 22. Unit capacity Factor (Using DER Net) 4 o 9 7
'7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Nc.st 6 Months (Type.Date.and Duration of Eacht:
None NA
- 25. If Shut Down At 1:ml Of lleport Priimi. Estimated Date of Startup:
Achieved Forcenst
- 26. Units in lest Status (Psior to Conuncreial Operationi:
5 INillAI. CI:ll n'AI.lTY INIII AI. I 1.I'C ll:IClIY COMMI ItCI AI. Ol'11: A IlON
- . 6 p,j77) 79021300 Q
o Summary of Operating Experience January 1979 Indian Point Unit 3 was synchronized to the bus for a total of 724.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> producing a gross generation of, 709,730 mwh for this reporting pariod.
During the reporting period, the unit experienced two reactor trips.
The first trip occurred on January 9 at 12:51 and unit returned to service 19:38 of the same day.
The second trip occurred on January 10 at 09:35 with unit being returned to service at 22:41. Both trips occurred during the performance of a periodic surveillance test overpower, over temperature delta T.
Subsequent investigations attributed the cause of the trips to be intermittent open circuits in one reactor protection system logic train that enabled the trip logic coincidence circuit to be made up.
This problem was found and corrected after the second trip and the unit was subsequently returned to service.
D e
I o
AVI R AGl. DAILY llNil POWiin 1.1.VI.l.
- DOCKET NO.
50-2ff.
I nd s on Po._, int UNIT No.3 2-1-79 DATE COMPLETED 13y C. _C onne 11 TELEPIlONE 914-739-8200 Af0NTil Jamaan DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (agwe. Net)
(MWe Net) 962 960 17 1
962 955 gg 2
959 950 39 3
4 oc' 20 956 960 49' 21 5
961 oss 22 6
9s7 neo 23 7
965 958 24 8
965 541 25 9
956 30 1'd 26 958 857 Il 27 962 060 23 12 962 962 29 13 960 964 30 14 959 963 3g IS 964 16 INSTRUCTIONS On tids fornut. list the aserage daily unit power levelin alwe. Net for cach day in the reporting inonth. Coinpute io the nearest whole nqawatt.
(9/771
G 50-286 UNIT Sl!UTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT N etE Indian Point Unit 3 DATE 2-1-79 REPORT MONTil January COMPLETED BY
- c. connell TELEI'110NE 914-739-8200 n.
- 325 5
e ci
.E ?
g
,.5 ~4 Licensec 5+o gn Cause & Currective o
o No.
Date o.
3g
,ggy Event u?
o.b' Action to N
E 31;5 g Report 4.
$0 5
Prevent Recurrence U
e Q
23 790109 F
6.95 A
3 NA IA INSTRU Intermittent open circuit, cause
, undetermined (Subsequently found X
to be caused by loose wires. (#24) 24 790110 f
3.10 A
3 NA IA INSTRU Intermittent open circuit due to X
loose wires. Tightened loose wires
~
- g..
a I
2 3
4 F: Forced
~ Reason:
Method:
Exhibit F -Instructions S: Scheduled A Equipment Failure (Explain)
- 1. Manual for Preparation of Data D. Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other(Explaia) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibi.n - Same Source (9/77)
II-Oiher (Explain) u
e
- MONTIILY MAINTENANCE REPCRT January 1979 Month DATE.
W.R.
EQUIPMENT MALFUNCTION CORRECTIVE ACTION 12-11-78, I-409-03 342 RCS Letdown Isolation Needs to be repacked Repacked valve 12-11-78 I-410-03 561 A, B, C, D, RCS Root Stop leak on RTD Manifold Repacked 12-11-78 I-411-03 LCV 460 RCS Packing leak Repacked 12-11-78 I-412-03 LCV 459 RCS Packing leak Repack 12-10-78 I-408-03 204B CVCS Bonnet Gasket leak Inspected Valve Internal, replaced Gasket 12-11-78 I-414-03 897A Lo Head RIIR Check Valve Cover Leak Repaired Valve Cover Leak 1-2-79 I-283-02
- 32 Auxiliary Boiler Feed Rotating Element Overhauled rotating element and Pump steam Turbine I-2-79 I-421-02
- 31 Charging Pump
- 1 Cylinder packing leak Repacked #1 Cylinder 1-16-79 I-423-02
- 31 CVCS Charging Pump
- 5 Cylinder packing leak Repacked #5 Cylinder
, 1-18-79 I-426-02
- 31 Instrument Air Piston packing leak Replaced piston packing Compress e.
e
i MONTHLY I & C CATEGORY I REPORT 0
January 1979 Month Date l
W.R.
Equipment Malfunction Corrective Action 12/19/78 I&C-I-00243-2 NIS Channel 42 Petector A Test Signal Pot Replaced Potentiometer, defective tested Satisfactorily.
1/22/79 I&C-I-00270-lC PWST Level Ind. LT-ll31 Failed indication due to Applied heat to thaw pipes, frozen sensing lines indicator returned to service 1/22/79 I&C-I-00272-2 TT 431-A, R.C.
Hot Let Output drifting low Replaced with new unit.
R/E Converter Calibrated new unit and tested per 3PL-RIA 1/23/79 I&C-I-00273-2 Radiation Monitor R-5 Erratic indication when Cleaned and inspected draw drawer opened or moved P.C. cord connectors and ribbon connector. Erratic indication not repeatable.
1/15/79 I&C-I-00241-2 Boric Acid Flow Meter Counter does not appear to be Redressed cab.le from sensor YIC 110 accurate to converter - problem did not repeat.
2/2/79 I&C-I-00233-2 R-ll & R-18 Plastic tab broken on BFD Replaced relay. Tested Relay Satisfactorily.
e e
e