Forwards IE Insp Rept 50-423/78-06 on 781128-1201. No Noncompliance Noted
ML19263C126
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/26/1978
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19263C127 List:
References
NUDOCS 7902070085
Download: ML19263C126 (2)


See also: IR 05000423/1978006

Text

-

. . . .

--

- - . - . .

- - . . -

- . .

-

.

  1. Ng

UNITED STATES

,

'

t

NUCLEAR REGULATORY COMMISSION

.,fI

  • 1

o

REGION I

'

f

Gh

  1. f

$31 PARK AVENUE

g

g-

KING OF PRUSSIA. PENNSY1.VANIA 19404

%**

jet 2s018

Docket No. 50-423

i

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

,

j

P. O. Box 270

i

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-423/78-06

i'

This refers to the inspection conducted by Mr. A. Toth of this office on

November 28 to December 1,1978, at the Millstone Nuclear Power Station,

i

Unit 3, at Waterford, Connscticut, of activities authorized by NRC

License No. CPPR-ll3 and to the discussions of our findings held by Mr.A. D.

Toth with Mr. S. Toth of your staff at the conclusion of the inspection.

j

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

i

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2 Title 10, Code of Federal Regulations, a copy of this letter and the

,

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

-

believe to be proprietary, it is necessary that you make a written

,

I

application within 20 days to this office to withhold such information

i

from public disclosure.

Any such application must be accompanied by an

j

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

i

of reasons which addresses with specificity the items which will be

considered by the Comission as listed in subparagraph (b)(4) of Section

2.790.

The information sought to be withheld shall be incorporated as

i

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

i

will be placed in the Public Document Room.

79020700 6

d

._.

_ ..

-

-

.

-

--

_

. - - - - -

-

-.

_ _ . - - - - .

-

- -.--

-

.

.

.

,

L

Northeast Nuclear Energy Company

2

!

.:

No reply to this letter is required; however, should you have any ques-

tions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

/) h5

Robert T. C 1

, ::hief

Reactor Construction and Engineering

I

Support Branch

i

Enclosure:

Office of Inspection and Enforcement Inspection

Peport Number 50-423/78-06

1

cc w/ encl:

K. W. Gray, Construction Quality Assurance Lead

H. R. Nims, Director of Nuclear Projects

J. F. Opeka, Station Superintendent

!