Interim Rept Re Spare Containment Pipe Penetrations Not Being Sealed at Both ends:29 Spare Penetrations Have Been Found.Corrective Actions Continuing
ML19263B954
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/20/1978
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
661A, NUDOCS 7901250188
Download: ML19263B954 (1)


Text

-.1

e..,.,

VIRGINI A EL.ECTRlC AND POWER COMP ANY. RICHMOND, VeHGINI A 23261

, ju December 20, 1978 e

Mr. James P. O'Reilly, Director Office of Inspection & Enforcement Serial No.

661A U. S. Nuclear Regulatory Commission PSE&C/CGC/mac: wang Region II 101 Marietta Street, Suite 3100 Docket No 50-339 J Atlanta, Georgia 30303

Dear Mr. O'Reilly:

In accordance with 10CFR50.55(e), the NRC, Region II, was notified on November 20, 1978 that spare containment pipe penetrations are not sealed at both ends as stated in the FSAR Section 6.2.4.3, Subsection 4, Page 6.2-125.

We have determined that there are 29 spare penetrations all of which have a welded cap on the inside containment end only.

Our engineerin still in progress.g evaluation to determine the best corrective action is This 30-day report shall be considered an interim report.

A final report documenting the measures to be taken will be submitted by February 1, 1979.

4r trul y rs, i$ o ) h0('

/,

C. Brown, Jr.

Vi e President - P wer Station cc:

Mr. John G. Davis, Acting Director Office of Inspection & Enforcement Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation 7 9 012 5 0 / ff f omeme m 2