Comments on Need for Environ Impact Analysis Re Requested Amend Authorizing Increase in Number of Steam Generator Tubes Which Can Be Plugged W/O Reactor Power Decrease. EIS or Eia Should Be Required
ML19263B901
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/15/1979
From: Cutchin J
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Neighbors D
Office of Nuclear Reactor Regulation
Shared Package
ML19263B900 List:
References
NUDOCS 7901250057
Download: ML19263B901 (1)


Text

January 15, I???

'!ote to :on "eighbors, Project Manager, ORB =1 Re:

Preliminary Determination Not to Prepare EIA on Steam Generator Plugging at Surry 1 & 2 As we discussed, although I agree with the determination that the action should be orenoticed as involving'a significant hazards consideration, I disagree with the determination that no EIS or EIA/ND is required.

The requested amendment would auth'orize an increase in the number of steam generator tubes which can be plugged (from 255 to 285) without a reactor ower decrease. Vepco submitted a new ECCS to support its request.

The basis for decision on the proposed NEPA action states that there would :e no enange in environmental impact.

It acpears to me that the authorization of additional plugging will result in an increase in the doses to the workers who will do the plugging and may increase environ-mental inpact. Also, but for the action a decrease in power level would result. The action directly affects human beings and requires at least an analysis of wnether the, impact is significant.

If it is not significant, the staff may issue an EIA/ND.

If it is significant, the staff nust issue an EIS.

' b.>.v. x J. M. Cutchin, IV Attorney, OELD