ML19263B811

From kanterella
Jump to navigation Jump to search
Us Applications for Licenses to Export Nuclear Facilities or Matls. W/Att List of Applications Received
ML19263B811
Person / Time
Issue date: 01/17/1979
From: Oplinger G
NRC OFFICE OF INTERNATIONAL PROGRAMS (OIP)
To:
Shared Package
ML19263B809 List:
References
NUDOCS 7901240298
Download: ML19263B811 (2)


Text

.

NUCLEAR REGULATORY COMMISSION APPLICATIONS FOR LICENSES TO EXPORT NUCLEAR FACILITIES OR MATERIALS Pursuant to 10 CFR 110.70, "Public Notice of Receipt of an Application",

please take notice that the Nuclear Regulatory Commission has received the following applications for export licenses. A copy of each application is on file in the Nuclear Regulatory Comission's Public Document Room located at 1717 H Street, N.W., Washington, D.C.

FOR THE NUCLEAR REGULATORY COMMISSION e

hs Nerald G. OpTinger, Assistant Director Export / Import and International Safeguards Office of International Programs JAN 171979 Dated this day At Bethesda, Maryland Attachment 7 9 012 4 0 A9 $

EXPORT LICENSE APPLICATIONS SOURCE AND SPECIAL NUCLEAR MATERIAL IN KILOGRAMS Name of Applicant Date of Application

% Enriched Country of Date Received Ulthmate Application Humber Material Type Total Element Total Isotope End-use Destinattor Nissho-Iwai American 45.40 Enriched 12 5.448 Demonstration Experi-Japan 12/19/78 Uranium ments of medium 12/22/78 enriched uranium at XSNM01435 KUCA General Elect. Co.

3.1 Enriched 5,875 161 Reload fuel for Japan 12/22/78 Uranium Tsuruga 12/27/78 XSNM01436 Hissho-Iwai American 1.52 Enriched 12/29/78 Uranium 229.14 1.52 Fuel for advanced Japan 01/08/79 Thermal Reactor XSNM01439 "FUGEN"

2 Items 3-6, BWR's Only Item 7, functionability of.RCS Boundary Valves for Table 7 Pressures Functional analysis to determine pressure

$ 3,300 - $ 10,000 Qualify heavy section RCS components but not the RCP 16,700 Qualify RCP 18,900 - 100,000*

Qualify 6 B&W supplied boundary valves 6,700 -

33,000*

Qualify 4 owner supplied check valves 50,000 Total Direct Cost

$95,600 - $209,700 Sales Tax 5,000 11,000 Financing 7,000 16,000 Total Cost

$107,600 - $236,700 Item 8, Functionability of RCS Boundary Valves for Level C Stresses The note of Attachment 1 applies here.

Item 9, Replace Valves for which Functionability Cannot be Demonstrated The Item 9 costs cannot be shared with other utilities. Therefore the total remains $581,000 - $831,000.

  • The cost splits for the RCP and boundary valves are somewhat uncertain because the B&W 205 plants have different RCP and valve manufactures.

3

.. c..

Item 10, Add Three Safety Relief Valves Analysis to determine relief valve requirenent

$ 6,700 Reanalysis of surge line 50,000*

Procure 3 valves 400,000 Cutin 3 relief valves 192,450 Craft HP and security training 6,000 Total Direct Cost

$655,150 Sales Tax 34,000 Financing 48,200 Total Costs

$737,350 "There is the potential for some cost sharing on the surge line analysis but it would not be great and has not been included here.