ML19263B670

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 99900401/78-02 & Notice of Deviation
ML19263B670
Person / Time
Issue date: 07/21/1978
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Etheridge M
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML19263B662 List:
References
REF-QA-99900401 NUDOCS 7901220351
Download: ML19263B670 (2)


Text

b Jr-

~'

[en af c,D o

UN:TED STATES o,

NUCLEAR REGULATORY COMMISSION f g,,

'n REGION IV e

611 RYAN PLAZA DRIVE, SUITL 1000 5

. g[-

"g f

AR LIN GTON, TE X AS 76011 g

y 21 JUL 1973 Docket ilo.

99900401/78-02 Combustion Engineering, Inc.

ATTN:

Mr. M. R. Etheridge Vice President General Services 1000 Prospect Hill Road Windsor, Connecticut 06095 Gentlemen:

I This refers to the QA Program Inspection conducted by Mr. J. R. Costello of this office on June 27-30, 1978, of your facility at Windsor, Connecticut, and to the discussions of our findings with Mr. C. W. Hoffman i

and members of your staff at the conclusion of the inspection.

l Areas er.amined during the QA program inspection and our findings are discussed in the enclosed report. Within these areas, the inspection 1

consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During this inspection it was found that the implementation of your QA program failed to meet certain NRC comitments. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within thirty (30) days a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the dates your corrective actions and preventive measures were or will be completed.

In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply together with the enclosed inspection report will be placed in the Commission's Public Document Room.

If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure. Any 7901220 35/

Combustion Engineering, Inc. such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and sheuld be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, bL L

U. Potapcys, Chi Vendor Inspection Branch

Enclosures:

1.

tiotice of Deviation 2.

Inspection Report No. 99900401/78-02

.