Forwards IE Insp Rept 50-327/78-40 on 781204-06.No Noncompliance Noted
ML19263B621
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 12/15/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Niav Hughes
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19263B622 List:
References
NUDOCS 7901220239
Download: ML19263B621 (2)


See also: IR 05000327/1978040

Text

a

I

pn atCoq(o

UNITED STATES

,

NUCLEAR REGULATORY CCMMISSION

g

g

~

o

REGloN il

I

' .g

101 M ARIETTA STREET, N.W.

8

ATLANTA, GEORGIA 30303

o

s .... /

DEC 151978

e

In Reply Refer To:

RII:TJD

50-327/78-40

Tennessee Valley Authority

Attn:

Mr. N. B. Hughes

.

Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by Mr. T. J. Donat of this office

on December 4-6, 1978, of activities authorized by NRC Construction Permit

No. CPPR-72 for the Sequoyah Unit 1 facility, and to the discussion of our

findings held with Mr. J. M. Ballentine at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document,

Room.

If this report contains any information that you (or your,coniractor)

believe to be proprietary, it is necessary that you make a written applica-

tion within 20 days to this office to withhold such information form public

disclosure. Any such application must include a full statement of the

reasons on the basis of which it is claimed that the information is proprie-

tary, and should be prepared so that proprietary information identified in

the application is contained in a separate part of the document.

If we do

not hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

79012202h

.

.

'

fennessee Valley Authority

m2 5 79;

__

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

I

y-

F. J. Long, Chief'

Reactor Operations and

Nuclear Support' Branch

.

Enclosure:

Inspection Report No. 50-327/78-40

cc w/ enclosure:

Mr. J. E. Gilleland

Assistant Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Mr. G. G. Stack, Project Manager

Sequoyah Nuclear Plant

P. O. Box 2000

Daisy, Tennessee 37319

Mr. J. M. Ballentine

Plant Superintendent

Sequoyah Nuclear Plant

P. O. Box 2000

Daisy, Tennessee 37319

'

bComer

Street

,

I

W9D214

Knoxville, Tennessee 37002