ML19263B621
| ML19263B621 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 12/15/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Niav Hughes TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19263B622 | List: |
| References | |
| NUDOCS 7901220239 | |
| Download: ML19263B621 (2) | |
See also: IR 05000327/1978040
Text
a
I
pn atCoq(o
UNITED STATES
,
NUCLEAR REGULATORY CCMMISSION
g
g
~
o
REGloN il
I
' .g
101 M ARIETTA STREET, N.W.
8
ATLANTA, GEORGIA 30303
o
s .... /
DEC 151978
e
In Reply Refer To:
RII:TJD
50-327/78-40
Tennessee Valley Authority
Attn:
Mr. N. B. Hughes
.
Manager of Power
830 Power Building
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by Mr. T. J. Donat of this office
on December 4-6, 1978, of activities authorized by NRC Construction Permit
No. CPPR-72 for the Sequoyah Unit 1 facility, and to the discussion of our
findings held with Mr. J. M. Ballentine at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document,
Room.
If this report contains any information that you (or your,coniractor)
believe to be proprietary, it is necessary that you make a written applica-
tion within 20 days to this office to withhold such information form public
disclosure. Any such application must include a full statement of the
reasons on the basis of which it is claimed that the information is proprie-
tary, and should be prepared so that proprietary information identified in
the application is contained in a separate part of the document.
If we do
not hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
79012202h
.
.
'
fennessee Valley Authority
m2 5 79;
__
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
I
y-
F. J. Long, Chief'
Reactor Operations and
Nuclear Support' Branch
.
Enclosure:
Inspection Report No. 50-327/78-40
cc w/ enclosure:
Mr. J. E. Gilleland
Assistant Manager of Power
830 Power Building
Chattanooga, Tennessee 37401
Mr. G. G. Stack, Project Manager
Sequoyah Nuclear Plant
P. O. Box 2000
Daisy, Tennessee 37319
Mr. J. M. Ballentine
Plant Superintendent
Sequoyah Nuclear Plant
P. O. Box 2000
Daisy, Tennessee 37319
'
bComer
Street
,
I
W9D214
Knoxville, Tennessee 37002