Text

,

UNITED STATES

[g>n atc

og

NUCt. EAR REGULATORY COMMISSION

-g

o,,

..

R EGloN 11

g

) ,(

g

101 M ARIETTA sTR E ET, N.W.

c

' [

ATLANTA, GEORGI A 30303

o

%, . . . * * /

DEC 1 1 1978

In Reply Refer To:

RII:TJD

50-327/78-37

Tennessee Valley Authority

-

Attn:

Mr. N. B. Hughes

Manager of Power

830 Power Building

Chattanooga, Tennessee

37401

Gentlemen:

This refers to the inspection conducted by Mr. T. J. Donat of this

office on November 20-23, 1978, of activities authorized by NRC

Construction Permit No. CPPR-72 for the Sequoyah I facility, and to the

discussion of our findings held with Mr. J. M. Ballentine, Plant

Superintendent at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on tha basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear

from you in this regard within the specified period, the report

will be placed in the Public Document Room.

790118026

@

.

.

..

Tennessee Valley Authority

-2-

DEC i 1 1976

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

3

, . . _

W

'

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report No.

50-327/78-37

cc w/ enc 1:

Mr. J. E. Gi11 eland

Assistant Manager of Power

830 Power Building

Chattanooga, Tennessee 37401

Mr. G. G. Stack, Project Manager

Sequoyah Nuclear Plant

P. O. Box 2000

Daisy, Tennessee 37319

Mr. J. M. Ballentine

Plant Superintendent

Sequoyah Nuclear Plant

P. O. Box 2000

Daisy, Tennessee 37319

Mr. J. F. Cox

400 Commerce Street

W9D214

Knoxville, Tennessee 37902