ML19263B479
| ML19263B479 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 12/11/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Niav Hughes TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19263B480 | List: |
| References | |
| NUDOCS 7901180295 | |
| Download: ML19263B479 (2) | |
See also: IR 05000327/1978037
Text
,
UNITED STATES
[g>n atc
og
NUCt. EAR REGULATORY COMMISSION
-g
o,,
..
R EGloN 11
g
) ,(
g
c
' [
ATLANTA, GEORGI A 30303
o
%, . . . * * /
DEC 1 1 1978
In Reply Refer To:
RII:TJD
50-327/78-37
Tennessee Valley Authority
-
Attn:
Mr. N. B. Hughes
Manager of Power
830 Power Building
Chattanooga, Tennessee
37401
Gentlemen:
This refers to the inspection conducted by Mr. T. J. Donat of this
office on November 20-23, 1978, of activities authorized by NRC
Construction Permit No. CPPR-72 for the Sequoyah I facility, and to the
discussion of our findings held with Mr. J. M. Ballentine, Plant
Superintendent at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on tha basis of which it is
claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is
contained in a separate part of the document.
If we do not hear
from you in this regard within the specified period, the report
will be placed in the Public Document Room.
790118026
@
.
.
..
Tennessee Valley Authority
-2-
DEC i 1 1976
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Sincerely,
3
, . . _
W
'
F. J. Long, Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspection Report No.
50-327/78-37
cc w/ enc 1:
Mr. J. E. Gi11 eland
Assistant Manager of Power
830 Power Building
Chattanooga, Tennessee 37401
Mr. G. G. Stack, Project Manager
Sequoyah Nuclear Plant
P. O. Box 2000
Daisy, Tennessee 37319
Mr. J. M. Ballentine
Plant Superintendent
Sequoyah Nuclear Plant
P. O. Box 2000
Daisy, Tennessee 37319
Mr. J. F. Cox
400 Commerce Street
W9D214
Knoxville, Tennessee 37902