ML19263B367
| ML19263B367 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/11/1978 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19263B368 | List: |
| References | |
| NUDOCS 7901180110 | |
| Download: ML19263B367 (2) | |
See also: IR 05000445/1978021
Text
. g a8'Goq.
UNITED STATES
'
3
- o
fJUCLE AR REGULATORY COMMISSir>N
.
! y ) ,, d
REGION IV
$
611 RYAN PLAZA DRIVE, SUITE 1000
U
$ #'y;lj@
,5
ARLINGTON TEXAS 75011
g
.a
p*
- =*
December 11, 1978
In Reply Refer To:
RIV
Docket fio. 50-445/Rpt. 78-21
50-446/Rpt. 78-21
Texas Utilities Generating Company
ATTil: Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted by Mr. J. I. Tapia of our staff
during the period flovember 20-22, 1978, of activities authorized by flRC
Construction Permit flos. CPPR-126 and 127 for the Comanche Peak facility,
Units fio. I and 2, and to the discussion of cur findings with Mr. R. G.
Tolson and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, tF.e inspection con-
sisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspector.
Within the scope of the inspection, no items of noncompliance were iden-
ti fied.
In accordance with Section 2.790 of the f1RC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the f4RC's Public Document
Room.
If the report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office, within 20 days of the date of this letter, requesting that
such information be withheld from public disclosure. The application
must include a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Document Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Room.
79011801lo
Q
.
-
.
Texas Utilities Generating
Company
-2-
December 11, 1978
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
.'/...c_'~ Y Y
e.
.
W.C.Seibh, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report 50-445/78-21
50-446/78-21
cc: w/ enc 1.
Texas Utilities Generating Company
ATTil: Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas
75201