Responds to NRC Re Violations Noted in IE Insp Repts 50-321/78-33 & 50-366/78-41.Corrective Actions: Revision of Procedure & Startup Overlap Signed Off by Operations Supervisor
ML19263B302
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/06/1978
From: Staffa R
GEORGIA POWER CO.
To: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19263B301 List:
References
NUDOCS 7901180005
Download: ML19263B302 (2)


Text

.

  • Georgia Power Company 230 Peactatree Street Pest Office Box 4545 Atlanta. Georgia 30303 Teterhons 404 522 6000 dh

..l, L.g Go npi Power Power Supply Engineering and Servloes -

j'

J.

December 6, 1978 United States Nuclear Regulatory Commission Office of Inspection and Enforcement

REFERENCE:

RII: FSC Regien II - Suite 3100 50-321/78-33 101 Marietta Street Atlanta, Georgia 30303 50-366/78-41 ATTENTION:

Mr. F. J. Long Gentlemen:

The Georgia Power Company of f ers the following information in response to your letter of November 17, 1978, describing apparent noncompliances with NRC requirements noted during your October 3 - 7, 1976, inspection of the Hatch facility.

Deficiency 321/78-33-01 1.

In response to item regarding failure to revise plant procedures in a correct and timely manner, we are now in full compliance.

As dis-cussed in the supplementary information attachment for LER 78-63, Reactor Engineering personnel, af ter discovering the core maximum peaking fa tor (CHPF) problem, erroneously decided not to immediately revise the procedure but issue a Standing Order instead. The reason for this action was that a Technical Specification change was forth-coming which would eliminate the problem and require its own procedure revision.

2.

A procedure revision correcting this error was submitted on October 5, 1978, and approved by the Plant Review Board on October 11, 1978.

The Reactor Engineering personnel have been inrtructed that their action was incorrect and to follow plant procedures in handling similar situations in the future.

Infraction 366/78-41-01 1.

The Operations Supervisor interpreted Appendix H to allow a partial overlap of the first two pJateaus of startup.

At the time of the infraction, actual power Wts approximately 9% and indicated power was 17%.

The indicated power level was higher than actual power because of the high gain setting on the average power range monitors.

7901180006

k Georgia Power n U. S. Nuclear Regulatory Commission ATTN:

Mr. F. J. Long Page Two December 6, 1978 The portion of Appendix H in question was signed off by the Operations 2.

Supervisor within one day af ter the NRC exit interview.

3.

The second plateau of Appendix H, from rated temperature and pressure through 30 percent, has been signed off.

4.

The third and final plateau of Appendix H, 30 percent to 100 percent demonstration run, will be signed off at the proper time.

contains no information which is believed to be pro-The inspection report prietary.

Should you have any questions regarding the above, please contact my of fice.