ML19262C693
| ML19262C693 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 10/22/1979 |
| From: | Norderhaug L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Nilson R SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER |
| References | |
| NUDOCS 8002150419 | |
| Download: ML19262C693 (2) | |
Text
. - =
"V p ncy
/
'o UNITED STATES 8V - ' I,%
NUCLEAR REGULATORY COMMISSION h,h
$ $/J%
REGION V o,
g 1990 N. CALIFORNIA BOULEVARD
\\ ',N / /
SUITE 202, WALNUT CREEK PLAZA e
,,e WALNUT CREEK, CALIFORNIA 94596 0CT 22 1373 Docket tio. 70-1257 Exxon fluclear Company 2101 Forn Rapids Road Richland, Washington 99352 Attention: Dr. Roy !iilson, Manager Quality Assurance and Licensing Department Gentlenen:
Subject:
fiRC Inspection This letter refers to the inspection of your activities authorized under IRC License No. SNM-1227 conducted by Mr. L. W. Ivey of this office on September 10-13, 1979.
It also refers to the discussion of our inspection findings held by the inspector with Mr. R. Purcell and a member of his staff on September 13, 1979.
The inspection included examination of activities related to physical protection against industrial sabotage and against theft of special nuclear material in accordance with applicable requirements of Title 10, Code of Federal Regulations, Part 73, " Physical Protection of Plants and Materials,"
your security plan, and license conditions pertaining to physical protection as described in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and records, interviews with personnel and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
Durirg this inspection, it was found that one of your activities appeared to deviate from your Physical Security Plan, Revision 5, dated March 1977, as set forth in the Notice of Deviation, enclosed herewith as Appendix A.
Please submit to this office within 20 days of your receipt of this notice, a written reply, and include your comments concerning this item, a descrip-tien of any steps that have been or will be taken to prevent recurrence, and the date all corrective actions or preventive measures were or will be co*pleted.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, docurentation of the findings of your safeguards and security measures are exempt from public disclosure; therefore, the enclosed inspection report will not be placed in the Public Document Room.
8002150 411
Exxon fluclear Cenpany OCT 23 979 Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely,
'A
,-7
.,4'(/
j' <.2 N D:
ge
- . /.x - ;>"
L. R. floYderhaug, Chie F Safeguards Branch E. Closures:
1.
Appendix A - flotice of Det>iation 2.
IE Inspection Report flo. 70-1257/79-08 (IE-V-332) cc w/ enclosures:
R. Purcell, Manager Auxiliary Operations