ML19262C688

From kanterella
Jump to navigation Jump to search
Forwards LER 80-005/03L-0
Date released: 10/03/2019 Download: ML19262C688


LER 80-005/03L-0:on 800119,during Power Operation,Tech Specs 4.8.1.1.1.a & 4.8.1.1.2a4 for Electrical Power Sources Were Not Performed within 1-h.Caused by Personnel Misinterpretation of Tech Spec Requirements
ML19262C691
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/07/1980
From: Baxley S
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19262C691 (2)
Forwards LER 80-005/03L-0
ML19262C687
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/07/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19262C687 (1)