ML19262C555

From kanterella
Jump to navigation Jump to search
Forwards BAW-1598, Facility Cycle 2 - Reload Rept, Transmitting Application for Amend to OL & Justifying Cycle 2 Operation of Facility at Licensed Core Power Level. Includes Proposed Mods to Tech Specs App A.Fee Encl
Date released: 10/03/2019 Download: ML19262C555


Facility Cycle 2 Reload Rept. Revised by Util
ML19262C556
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/01/1980
From:
BABCOCK & WILCOX CO.
To:
References
Download: ML19262C556 (90)
Forwards BAW-1598, Facility Cycle 2 - Reload Rept, Transmitting Application for Amend to OL & Justifying Cycle 2 Operation of Facility at Licensed Core Power Level. Includes Proposed Mods to Tech Specs App A.Fee Encl
ML19262C554
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/11/1980
From: Crouse R
TOLEDO EDISON CO.
To: REID R N
Office of Nuclear Reactor Regulation
References
Download: ML19262C554 (2)