ML19262C554

From kanterella
Jump to navigation Jump to search
Forwards BAW-1598, Facility Cycle 2 - Reload Rept, Transmitting Application for Amend to OL & Justifying Cycle 2 Operation of Facility at Licensed Core Power Level. Includes Proposed Mods to Tech Specs App A.Fee Encl
ML19262C554
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/11/1980
From: Crouse R
TOLEDO EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
Shared Package
ML19262C555 List:
References
NUDOCS 8002140428
Download: ML19262C554 (2)


Text

TOLEDO

%ms EDISON Docket No. 50-346 p c+c p cacest License No. NPF-3 ;2lf?"

Serial No. 590 cm w February 11, 1980 Director of Nuclear Reactor Rey 11ation Attention: Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Reid:

Enclosed are three (3) original and forty (40) conformed copies of BTW-1598, Davis-Besse Nuclear Power Station, Unit 41, Cvele 2-Reload Xeoort dated January,1980 (revised by Toledo Edison on February 6, 1980). This report transmits an application for amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit 41 (DB-1) and justified the cycle 2 operation of the facility at its licensed core power level of 2772 MWT.

Section 8 of this reload report proposes modificatians in the DB-1 Technical Specifications, Appendix A. These include changes in the Safety Limits, Limiting Saf ety System Settings, iiriting Conditions for Operation, Surveillance Requirements and the Technical Specification Bases.

This amendment request involves sevecal changes of Class Ill type and is therefore deternined to be a Class IV amendment. A check for $12,300.00, as required by 10CFR170.22, will be submitted separately.

Very truly yours,

[ mn-RPC:TJM: sic

\

$f1 THE TCtECO EDISCN COMPANY ECISON PtAZA 300 MADISCN AVENUS TCtEDO. CH!O 43S52 8 0 ():' 1 10 4 d

APPLICATION FOR AMENDMENT ID FACILITY OPERATING LICENSE NO. NPF-3 FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 Enclosed are forty-three (43) copies of BAW-1598, Davis-Besse Nuclear Power Station. Unit 1-Reload Report dated January, 1980, (re ' by Toledo Edison, February 6, 1980). This report requests changes to the Davis-Besse Nuclear Fower Station Unit No. 1 Facility Operating License No. NPF- 3. The proposed Technical Specifications include changes in the Safety Limits, Limiting Safety System Settings, Limiting Conditions for Operatien, Surveillance Requirements and Bases sections of Appendix A.

By 7 /s Vice President, Nuclear Sworn to and subscribed before me this eleventh day of February, 1980.

By <

, MtM

' Notary Public L!ND' L f 'T j n

,,7 g, a ,w