Responds to NRC Re Violations Noted in IE Insp Rept 50-482/79-17.Corrective Actions:Blasting Work Suspended in Ultimate Heat Sink Area Until Blasting Procedure Revised
ML19262C417
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/27/1979
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19262C415 List:
References
NUDOCS 8002120227
Download: ML19262C417 (2)


Text

.

KANSAS GAS AND ELECTRIC COMPANY GLCNN L.aOCSTC#

vict entsionsst oetmat ooes November 27, 1979 Mr. W.C. Seidle, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 75012 Re:

NRC Docket No. STN 50-482/Rpt 79-17

Dear Mr. Seidle:

This letter is written in response to your letter of October 29, 1979, which transmitted Inspection Report 50-482/79-17. As requested, the finding is being addressed in three parts:

a)

Corrective steps which have been taken arm the results achieved; b)

Corrective steps which have been taken to avoid further noncompliance, and c)

The dates when full compliance will be achieved.

I948 250 Finding The qualification of the blasting specialist assigned by Clarkson (Contractor) to conduct blasting operations on September 15, 1979, and the days fo? lowing had not been approved by the Daniel International Area Civil Engineer (Pur-chaser).

Response

a)

On September 15, 1979, Clarkson assigned a new blasting specialist to the ultimate heat sink area without first obtaining Daniel's approval.

Daniel advised Clarkson by letter dated September 20, 1979, of their failure to follow this requirement and requested that all Work Procedures be strictly adhered to.

It should be noted that the blasting done on September 15, 1979 was monitored by Dames & Moore.

The recorded peak particle velocity of 8002120549-7..,

201 N. Market - Wichita, Kansas

.*. fail Address: P. O. Bcx 208 i Wichita. Kansas E7201 - Telephone Area Code (316) 264-1111

6 Mr. W.C. Seidle November 27, 1979

.0066 in/sec was well below the maximum allowabin velocity of

.5 in/sec.

Also, Daniel has subsequently reviewed the qualifications of Mr. Richard D. Blake and has verified that he is adequately qualified to perform blasting work.

b)

To prevent recurrence of this problem, blasting work was suspended in the ultimate heat sink area until Clarkson's Blasting Procedure (B-1) was revised.

The revised procedure requires that the qualification of the blasting specialist (s) shall be attached to and be a part of the approved blasting procedure. Also, it is now required that the name of the assinned blarting crecialist appear on each blact plan.

c)

Full compliance for this item was achieved on November 26, 1979.

Please advise if you need additional information.

Yours very truly,

/

'f 0 b'

,, J 4

GLK:bb i948 251