ML19262C357
| ML19262C357 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 01/23/1980 |
| From: | Falter H EMVMORKP |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEIN-79-23, NUDOCS 8002110370 | |
| Download: ML19262C357 (1) | |
Text
f
~
CREATORS OF ELECTRICi'.
h')
3"ju POWER SUPPLY SYSTEMS k POWER SYSTEMS A MORRISOMNUDSEN DIVISION w-OCKY OUNT H CARO I 27 1 PHONE (919) 977-2720 / TWK (510) 9M725 O
January 23, 1980
~ :c e_
-m R
>z nm ES dO
- x N,m y
C Nuclear Regulatory Commission Region II Office 101 Marietta St. N.W.
N ri '
5"'
Suite 3100 Atlanta, Georgia 30333
Reference:
NRC IE Infonnation Notice No. 79-23 Emergency Diesel Generator Lube Oil Cooler
Dear Sir:
We have been informed that there has been an Electro Motive Division of General Motors lube oil cooler failure at the Portland General Electric Trojan #1 Plant in Rainier, Oregon.
The nature of the failure is similar to that reported in the NRC IE Information Notice No. 79-23. We have requested a section of the failed core be returned to General Motors for analysis.
Very truly yours, POWER SYSTEMS A MORRISON-KNUDSEN DIVISION Jw mm Harry W. Falter Division Engineer HWF:sjw
~
1946 128 6%2//6 T76