UNITED STATES
-
g,8
NUCLEAR REGULATORY COMMisslON
[
REGION I
o
$
$
431 PARK AVENUE
f
KING OF PRUSSI A. PENN5YLVANIA 19406
%, %.. /
1
Docket No. 50-213
Connecticut Yankee Atomic Power Company
ATTN: Mr. D. Switzer
President
P. 0. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-213/79-06
This refers to the inspection conducted by Mr. J. R. White of this office on
February 14-16, 26-28, and March 5-9, 1979'of activities authorized by NRC
License No. DPR-61 and to the discussions of our findings held by Mr. White with
yourself and other members of your staff at the conclusion of the inspection.
The enforcement correspondence pertaining to this inspection has been separately
provided by NRC, Office of Inspection and Enforcement, Washington, D.C.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any infonnation that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
Document Room.
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
%;. YN.
bha -
Boyce H. Grier
lh44
}4b
s
L J
s002080
4
.
.
Connecticut Yankee Atomic Power
2
DEC 131]73
Company
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-213/79-06
cc w/ enc 1:
R. Graves, Plant Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himelwright, Licensing Safeguards Engineer
.
6
1944
147