ML19262C218

From kanterella
Jump to navigation Jump to search
Forwards LERs 80-001/03L-0 & 80-003/03L-0
Date released: 10/03/2019 Download: ML19262C218


LER 80-003/03L-0:on 800104,determined Surveillance Test FNP-1-STP-109 Re Power Range Neutron Flux Channel Calibr Not Performed During Required Interval.Caused by Personnel Error.Test Performed & Personnel Instructed
ML19262C220
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/01/1980
From:
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19262C220 (1)
LER 80-001/03L-0:on 800106,fuel Storage Pool Area Radiation Monitor Declared Inoperable Due to hi-alarm Being Set Above Tech Specs.Caused by Setpoint Drift.Instrument Recalibr
ML19262C219
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/01/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19262C219 (1)
Forwards LERs 80-001/03L-0 & 80-003/03L-0
ML19262C217
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/01/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19262C217 (1)