Forwards IE Insp Rept 50-483/79-13 on 791105-30 & Notice of Violation
ML19262C181
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/20/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML19262C182 List:
References
NUDOCS 8002070065
Download: ML19262C181 (2)


See also: IR 05000483/1979013

Text

'

'o

UNITED STATES

8'

NUCLEAR REGULATORY COMMISSION

) ,7

.r

REGION lil

g

o,

[

799 ROOSEVELT ROAD

% . . . . . p

GLEN E LLYN, ILLINolS 60137

DEC 2 01979

Docket No. 50-483

Union Electric Company

ATTN:

Mr. John K. Bryan

Vice President - Nuclear

Post Office Box 149

St. Louis, MO 63166

Gentlemen:

This refers to the inspection conducted by Mr. W. A. Hansen of this office

during the period of November 5-30, 1979, of activities at the Callaway,

Unit 1, construction site authorized by NRC Construction Permit No. CPPR-139

and to the discussion of our findings with Mr. Weber and others of the

Callaway staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and inter-

views with personnel.

During this inspection, certain of your activities appeared to be in noncom-

pliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to sub. nit to this office within thirty days of your

receipt of this notice a written statement or explanation in reply, including

for each item of noncompliance: (1) corrective action taken and the results

achieved; (2) corrective action to be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold such

1926 259

8 00ggy0

gg [

.

CEC 2 01979

'

Union Electric Company

-2-

information from public disclosure. The application must include a full state-

ment of the reasons for which the information is considered proprietary, and

should be prepared so that proprietary information identified in the application

is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclo-ures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-483/79-13

cc w/encls:

Mr. W.11. Weber, Manager

Nuclear Construction

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Regions I & IV

Ms. K. Drey

Mr. Ronald Fluegge, Utility

Division, Missouri Public

Service Commissien

1926 260