ML19262C163
| ML19262C163 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 01/14/1980 |
| From: | Parr O Office of Nuclear Reactor Regulation |
| To: | Peoples D COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 8002070038 | |
| Download: ML19262C163 (3) | |
Text
-
~
Distribution y Docket Files ?
NRR Reading A. Bournia BCC: NSIC NRC PDR S. Varga M. Rushbrook TIC Local PDR F. Williams OELD ACRS(16)
LWR #3 File
- 0. Parr IE (3)
Docket Nos. 50-373 and 50-374
'#Q;-),,
JAN 14 1980 l'
[j),M/;,/
,x Mr. D. Louis Peoples Director of Nuclear Licensing 4/,; f Cormonwealth Edison Company
'4-f?j],-
P. O. Box 767 Chicago, Illinois 60690
Dear Mr. Peoplos:
SUEJECT: REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW 0F THE LA SALLE COUNTY STATION, UNITS 1 & 2, FINAL SAFETY ANALYSIS REPORT (FSAR)
As a result of our continuing review of the La Salle FSAR, we find that we need additional information to complete our evaluation. The specific information require <1 is listed in the enclosure.
Please inform us after receipt of this letter of the date you can supply the requested information.
Picase contact us if you desire any discussion or clarification of the enclosed recuest.
Sincerely.
OrHn-! C.;aad by, O. D. Parr Olan D. Parr, Chief Light Water Reactors Branch No. 3 Division of Project Management
Enclosure:
Request for Additional Information cc w/ enclosure:
See next page
}92b }bl 80 02070052 Orrice >.. LWR.J3: LPM. - LWR.13:BC.
suRNauch(. ABourni.a/Lli ODParr o,,c) 1/
,/80 1/
/80 f4RC FORM 318 (9 76) NRCM 0240 NU.S. GOVERNMENT PRINTING OFFICE: 1979 289 369
~
cc: Mr. D. Louis Peoples JAN 141980 cc: Richard E. Powell, Esq.
Isham, Lincoln & Beale One First flational Plaza 2400 Chicago, Illinois 60670 Dean Hansell, Esq.
Assistant Attorney General State of Illinois 188 West Randolph Street Suite 2315 Chicago, Illinois 60601 Mr. Roger Walker, Resident Inspector U. S. fluclear Regulatory Commission P. O. Box 737 Streator, Illinois 61364 1926 162
ENCLOSURE _
Request for Additional Information La Salle County Station, Units 1 & 2 Docket Hos. 50-373 and 50-374
'420.0 QUALITY ASSURANCE BRANCH 423.42 It has come to our attention that although some applicants had committed to Regulatory Guide 1.68, they did not intend to conduct full-load tests of some 4160-480 volt transformers supplying power to vital buses.
Your test description in FSAR Chapter 14 does not contain sufficient detail for us to determine if you intend to conduct such a test.
It is our position that full-load tests of vital buses must be conducted including all sources of power supplies to the buses. Modify your test description to indicate that this testing will be conducted in accordance with Regulatory Guide 1.68.
State your intent to comply with our requirements.
1926 163