Requests That Util Conduct Cultural Resources Survey of Ray Braswell Transmission Line right-of-way Prior to Const. Survey Should Be Coordinated W/State Historic Preservation Officer.State of Ms Encl
ML19262C118
Person / Time
Site: Grand Gulf 
Issue date: 01/18/1980
From: Ballard R
Office of Nuclear Reactor Regulation
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
References
NUDOCS 8002060039
Download: ML19262C118 (2)


Text

.

DISTRIBUTI0tl Docket File (Environ)

JAN 181980 f1RC PDR Local PDR h

Docket flo:

50-417 f1RR Reading EP-1 Reading tilssissippi Power and Light Company a

ATTil: :tr. it. L. Stampley, Vice President THoughton Production and Engineering EKetchen P. O. Cox 1640 LBykoski Jackson,flississippi 39205 PCota MSlater Gentlemen:

The construction permit for Grand Gulf liuclear Station Unit flo. 2 requires you to follow the Environmental Protection Program Respecting Construction of Grand Gulf fluclear Station, Units 1 and 2, as set out in Staff Exhibit 2-A in the evidentiary hearing on environmental matters conducted by the Atomic Safety and Licensing Board February 19-21, 1974.

Item 6.5 of the Environmental Protection Program specifies that, prior to construction of transmission lines, the tran:.aission-line corridors will be inspected to determine the existence of unique or unusual features located within the construction rights-of-way.

The enclosed letter from the State ilistoric Preservation Officer (S!!P0) recor::nends a cultural resources survey of the Ray Braswell Transmission Line corridor, which we understand is being planned because of Unit 2.

Since 36 CFR 000.l(a)(2) requires us to follow the recommendations of the Slip 0 in this matter, we are requesting that you conduct the recommended survey prior to construction of the Ray Braswell Transmission Line. Survey results should be presented to me. This survey should be coordinated with the SHP0 to insure that he finds the survey adequate.

Sincerely, Oriz!rral signed t:y Rennfd L Daltsrd Ronald L. Dallard, Chief Environmental Projects Branch flo. 1 Division of Site Safety and Environmental Analysis

Enclosure:

Ltr fm E. Ililliard to R. Ballard dtd 1/3/80 c c:

E. Ililliard 1926 303 Service list C

orncc)

. DSE : EP.-l.

.DSNPk gg Rtehnerd s _ 4 ecote: g0 86 D W..ur

,,cy!1/17/8 '

f 1// /80

- c,e _,....,i._,

< m. _ <~,..,~,,~em y e,m.me

Mississippi Power & Light Company Mark J. Wetterhahn, Jr., Esquire Conner Moore & Cober 1747 Pennsylvania Avenue, fl.W.

Washington, DC 20006 Robert B. McGhee, Esquire Wise, Carter, Child, Steen & Caraway P. 0. Box 651 Jackson, Mississippi Bechtel Powe. Corporation J. J. Tkacik, Project Engineer Grand Gulf fluclear Station P. O. Box 607 Gaithersburg, Maryland 20760 Mr. Davis M. Starnes President, Claiborne County Board of Supervisors Pattison, Mississippi 39144

. = -.

d 1926 304

-