ML19262C094

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-498/79-20 & 50-499/79-20 on 791113-16 & Notice of Deviation
ML19262C094
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/12/1979
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Eric Turner
HOUSTON LIGHTING & POWER CO.
Shared Package
ML19262C095 List:
References
NUDOCS 8001280288
Download: ML19262C094 (2)


See also: IR 05000498/1979020

Text

. _ _ _

_

-

.-

__

[5G

UNITED STATES

[f *"'cu]o

e

,

NUCLEAR REGULATO'RY COMMISSION

+

,,

REGloN IV

o

<

o

611 RY AN PLAZA DRIVE,SulTE 1000

,

5'

,

-f

ARLINGTON, TEXAS 7G012

o

-8

% .%

  • o

December 12, 1979

m.

In Reply Refer to:

RIV

Docket No. 50-498/Rpt. 79-20

50-499/Rpt. 79-20

.

Houston Lighting and Power Company

ATTN:

Mr. E. A. Turner, Vice President

Power Plant Construction and

Technical Services

Post Of fice Box 1700

Houston, Texas

77001

Gentlemen:

This refers to the inspection conducted by Mr. L. D. Gilbert and other

members of our staff during the period November 13-16, 1979, of activities

authorized by NRC Construction Permits No. CPPR-128 and 129 for South

Texas Project, Units No. I and 2, and to the discussion of our findings

with Mr. L. D. Wilson and other members of your staff at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, intervi ws

with personnel, and observations by the inspectors.

Within the scope of the inspection, no items of noncompliance were identified.

We have also examined action you have taken with regard to previously identi-

fied inspection findings. The status of these items is identified in para-

graph 2 of the enclosed report.

During the inspection, it was found that certain of your activities appeared

to deviate from commitments in the FSAR. This item and references to the

specific commitments are identified in the enclosed Notice of Deviation.

Please provide us within 30 days, in writing, with your comments concerning

this item, a description of any steps that have been or will be taken to

correct it, a description of any steps that have been or will be taken to

prevent recurrence, and the date all corrective actions or preventive

measures were or will be completed.

'

t.

l816

132

'

Q

s 001es o

af

e

.

-

.

llouston Lighting and Power Company

2

December 12, 1979

In accordance with Section 2.790 of the NRC's Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure.

The application must include a full statement of the reasons

why it is claimed that the information is proprietary.

The application should

.

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

w"

W. C. Seidle, Chief

_

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Deviation

-

2.

IE Inspection Report No. 50-498/79-20

50-499/79-20

1816