ML19262B896

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-35, Control of Maint & Essential Equipment. No Action or Response Required
ML19262B896
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/31/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
References
NUDOCS 8001160310
Download: ML19262B896 (1)


Text

'

/

'o,,

UNITED STATES t

NUCLEAR REGULATORY COMMISSION

.E REGION il o

101 MARIETTA ST., N.W., SUITE 3100 g

o ATLANTA, GEORGIA 30303 In Reply Refer To:

DEC 31679 RII:JPO South Carolina Electric and Gas Company Atta:

T. C. Nichols, Jr., Vice President Power Production and System Operations Post Office Box 764 Columbia, South Carolina 29218 Gentlemen:

The enclosed IE Information Notice No. 79-35 provides information on the control of maintenance and essential equipment.

~

Sincerely,

&s t -

f James P. O'Reilly Director

Enclosures:

1.

IE Information Notice No. 79-35 w/its enclosures 2.

Recently Issued IE Information Notices 0

e 1754 351 8I,01160

t UNITED STATE 3 SSINS No.:

6870 NUCLEAR REGULATORY COMMISSION Accessions No.:

OFFICE OF INSPECTION AND ENFORCEMENT 7910250510 WASHINGTON, D.C.

20555

  • 'h Vt n

December 31, 1979

""E

~

IE Information Notice No. 79-35 CONTROL OF MAINTENANCE AND ESSENTIAL EQUIPMENT Description of Circumstances:

Enclosed is a copy of a recent enforcement action against Duguesne Light Company.

A copy of this action is being forwarded to all utilities with a power reactor operating license or a construction permit. This is being done to apprise you of a serious condition which revealed an apparent weakness in facility control of maintenance and essential equipment.

You should review your existing procedures and control for independent verification of operability of redundant counterpart equipment when an essential component, subsystem, or system is determined inoperable. Operability is defined as follows:

A system, subsystem, trr.in, component or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified function (s).

Implicit in this definition shall be the assumption that all necessary attendant instrumentation, controls, normal and emergency electrical power sources, cooling or seal water, lubrication or other auxiliary equipment that are required for the system, subsystem, train, component or device to perform its function (s) are also capable of performing their related support function (s).

If you have any quations regarding this matter, please contact the Director of the NRC Regional Office in which your facilities are located. No written response to this IE Information Notice is required.

Enclosure:

Letter to Duguesne Light Company from V. Stello, Jr., dtd. 12/5/79 w/Appendicies A, B and C 4

DUPLICATE DOCUMENT Entire docurlent previously entered into system under:

1754 352 nuo 7floMb(TIb No. of pages:

h