ML19262B475

From kanterella
Jump to navigation Jump to search
Ack Receipt of 791120 Interim Rept Re Raceway Hanger Support Limitations.Final Rept Will Be Reviewed Upon Receipt
ML19262B475
Person / Time
Site: Fermi, 05000452, 05000453  DTE Energy icon.png
Issue date: 12/12/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 7912280058
Download: ML19262B475 (1)


Text

b

/ a acc,#'o m

o UNITED STATES

!],s,7 g

NUCLEAR REGULATORY COMMISSION g.. " ).. t REGION 111 o,,  %,7 [gf 799 ROOSEVELT ROAD GLEN ELLYN,ILLINols 60137 C _121979 Docket No. 50-341 Docket No. 50-452 Docket No.40-453 The Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:

Thank you for your interim report dated November 20, 1979, pursuant to 10 CFR 50.55(e) regarding laminations in raceway hanger support plates purchased through L. K. Comstock for use at the Fermi 2 site. We will review your final report on this matter upon receipt.

Your cooperation with us is appreciated.

Sincerely, 47 4 '

G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc w/1tr dtd 11/20/79:

Central Files Reproduction U:it NRC 20b PDR NSIC 1648 087 791ec eo g GW 3