ML19262A963

From kanterella
Jump to navigation Jump to search
Forwards LER 79-020/03L-0
Date released: 10/03/2019 Download: ML19262A963


LER 79-020/03L-0:on 791031,during Insps of Accessible Piping,Eight Snubbers on Safety Injection Sys Piping Found Inoperable.Caused by Improper Installation of Anchor Bolts. Base Plate Redesigned & Anchor Bolts Reinstalled
ML19262A969
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/05/1979
From: Eidem M, Kusek L
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19262A969 (5)
Forwards LER 79-020/03L-0
ML19262A962
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/05/1979
From: Stevens S
OMAHA PUBLIC POWER DISTRICT
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19262A962 (1)