ML19262A790

From kanterella
Jump to navigation Jump to search
Forwards QA Program Insp Rept 99900521/79-02 on 790604-07 & Notice of Deviation
ML19262A790
Person / Time
Issue date: 06/28/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Caraco I
BECHTEL GROUP, INC., BECHTEL POWER CORP.
Shared Package
ML19262A771 List:
References
REF-QA-99900521 NUDOCS 7912110042
Download: ML19262A790 (2)


Text

pn **cuq'o UNITED STATES

~g 8j NUCLEAR REGULATORY CO.4 MISSION 3.,

g

g' cj REGION IV 611 RYAN PLAZA DRIVE, SulTE 1000 o,

[g AR LINGToN, TEXAS 76012 June 28, 1979 Docket No. 99900521/79-02 Bechtel Power Corporation Los Angeles Power Division ATTN:

Mr. I. R. Caraco Vice President and General Manager P. O. Box 60680 Terminal Annex Los Angeles, California 90060 Gentlemen:

This refers to the QA Program inspection conducted by Mr. R. H. Erickley of this office on June 4-7, 1979, of your facility at Los Angeles, California, and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.

Areas examined during the QA Program inspection and our findings Are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the._ inspectors.

During this inspection it was found that the i=plementation of your QA Program failed to meet certain NRC cocmitments. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

hease provide us within thirty (30) days a written state =ent containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the dates your corrective actions and preventive measures were or till be completed.

In addition, your response to this letter should address tle actions you will take to eliminate mathematical errors in safety related engineering design calculations i.e. the type of errors identified in paragraph B.3 of DetailsSection I of the enclosed inspection report.

In accordance with Section 2.790 of the Co= mission's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply together with the ene.losed inspection report will be placed in the Cocmission's Public Document Ros2.

If this report contains any information that you believe to be proprietary, it is necessary that you =ake a written application,

within thirty (30) days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is clai=ed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the docu=ent.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

1532 277 7912110

[J//2

Bechtel Power Corporation

-:r. -

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, G

Jv Uldis Potapovs, Chief Vendor Inspection Branchi

Enclosures:

1.

Notice of Deviation 2.

Inspection Report No. 99900521/79-02 cc: Arizona Public Service Company Attn:

Mr. E. E. Van Brunt, Jr.

Vice President Construction Projects Post Office Box 21666 Phoenix, Arizona 85036 Southern California Edison Co.

Attn:

Mr. J. B. Moore Vice President 2244 Walnut Grove Avenue Rosemead, California 91770

\\

\\

bec:

'\\

AD/RCI (REINMLTd)

IE FILES NRR:DPM:QAB REG. I, II, III, & V PDR HQS CENTRAL FILES WEVETTER, RIV 1532 278