ML19262A784

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in QA Program Insp Rept 99900521/79-02.Requests Addl Info
ML19262A784
Person / Time
Issue date: 10/16/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Caraco I
BECHTEL GROUP, INC., BECHTEL POWER CORP.
Shared Package
ML19262A771 List:
References
REF-QA-99900521 NUDOCS 7912110034
Download: ML19262A784 (1)


Text

pn nsau f

o,,

UNITED STATES y;

g NUCLEAR REGULATORY COMMISSION G i' O5 REGION IV i

611 RYAN PLAZA DRIVE, SulTE 1000 S.,

g ARLINcToN, TEXAS 76012 9 *....,&

16 Oct 1979 Docket No. 99900521/79-02 Bechtel Power Corporation Los Angeles Power Division Attn:

Fx. 1. R. Caraco Vice Prrsident and General Manager P. O. Box 60680, Terminal Annex Los Angtles, CA 90060 Gentlemen:

Thank you for your letter of July 25, 1979 in response to our letter dated June 28, 1979. Your response to Deviation C of the Notice of Deviation transnitted as an enclosure to our letter of June 28, 1979 is unacceptable. We have conferred with NPR/QAB regarding this devi-ation and your response. The NRR/QAB position is that the commitments

=ade in Appendix A of BQ-TOP-1 take precedence over statements made in the text of your topical. NRR/QAB further stated that during their current review of BQ-TOP-1, Rev. 3, these seemingly ambigious statements in Section 17. of your topical vill be brought into agreement with your Appendix A, where;.n per=anent and nonpermanent records are both subject to ANSI N45.2.9 requirements with the only difference being in their period of retention.

Accordingly, with regard to Deviation C, please provide us a written statetent containing, (1) a description of steps that have been or will be taken to correct this item, (2) a description of steps that have been or vill be taken to prevent recurrence, and (3) the dates your corrective actions and preventive measures were er vill be completed.

Please provide the requested information within twenty (20) days in order that we may complete our review in a timely manner.

Sincerely,

.N f

L, W

Uldis Potapovs, Chief Vendor Inspection Branch 1532 269

~. -

791211o