Forwards IE Insp Repts 50-348/79-32 & 50-364/79-14 on 790925-28.No Noncompliance Noted
ML19262A585
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/22/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19262A586 List:
References
NUDOCS 7912070089
Download: ML19262A585 (2)


See also: IR 05000348/1979032

Text

!b

,

-

8')

'o,7,

UNITED STATES

'h

NUCLEAR REGULATORY COMMISSION

N

$

[E

v'

REGION II

o,,

101 MARIETTA ST N.W..SulTE 3100

%

j'

ATLANTA, GEORGIA 30303

'

In Reply Refer To:

OCT 2 21979

RII:A!Ol

50-348/79-32

50-364/79-14

Alabama Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by A. K. Hardin of this office on

September 25-28, 1979, of activities authorized by NRC License No. NPF-2 and

Construction Permit No. CPPR-86 for the Farley facilities, and to the discussion

of our findings held with J. D. Woodard at the conclusion of the inspection.

Areas examined during the inspection and our fi;0ings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC'E " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Roma. If this report contains

any information that you (or your ccatractor) believe to be propcietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such applicativt must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

the:a with you.

Sincerely,

(. . C.

C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

See Page 2

791g979 0

.

.

007 2 2 1979

'

Alabama Power Company

_2_

Enclosure:

inspection Report Nos. 50-348/79-32

and 50-364/79-14

cc w/ encl:

A. R. Barton

E-ecutive Vice President

P. O. Box 2641

Birmingham, AL 35291

J. T. Young

Vice President-Production

Post Office Box 2614

Birmingham, Alabama 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor

P. O. Box U

Ashford, AL 36312

1522 279