Forwards Insp Rept 50-289/71-01.Concrete Poured in Contact W/Surface Below 32F,contrary to FSAR Specs.Insp Showed No QA Program in Electrical & Instrumentation Areas
ML19262A468
Person / Time
Site: Crane 
Issue date: 02/19/1971
From: Howard E
US ATOMIC ENERGY COMMISSION (AEC)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19262A465 List:
References
NUDOCS 7910290810
Download: ML19262A468 (1)


Text

. _ _

c UNITED STATES

(,

ATOMIC ENERGY COMMISSION D

DIVISION OF COMPT.!ANCE 201 645 l 'l l*

l REGi3N I 970 BROAD STREET NEWARK. NEW JERSEY 07102 FEB 191971 J. B. Henderson, Chief, Reactor Construction [

Branch, Division of Compliance, HQ i

METROPOLITAN EDISON COMPANY, THREE MILE ISLAND UNIT NO.1 DOCKET No. 50-289 The enclosed report of the inspection of Metropolitan Edison Company's Three Mile Island Unit No. I construction site, conducted on January 18 and 19, 1971, by E. M. Howard and D. M. Hunnicutt, is forwarded for information.

I Concrete was placed, contrary to site procedures and the FSAR commitments, when the measured temperature of the surface to be in contact with the con-crete was less than 32 F.

This concrete placement represents a breakdown in the quality control function at the site in that the temperature was measured and reported by the QC personnel prior to the placement to project l

management. A CDN has been prepared.

l The inspection of the electrical and instrumentation area revealed the con-struction group had no q'sality control program in this area, and did not have knowledge of the latest FSAR revision. The A-E program review in this area revealed that a number of significan* ambiguities were not yet resolved among the licensee, constructor, and the A-E.

A CDN was not considered, since at 8

the time of the inspection no safeguards circuits were installed or in the process of installation.

f The inspection was terminated at approximately two o' clock pm on January 18, 1971, due to the confusion resulting from a fire whic; destroyed several trailers, but no project related components..

r f.l Howard c.

Senior Reactor Inspector

Enclosure:

CO Report No. 289/71-1. by E. M.

!4hh [h}

Howard and D. M. Hunnicut., dated 2/7/71 I

cc:

E. G. Case, DRS (3)

A. Giambusso, CO P. A. Morris, DRL L. Kornblith, Jr., CO R. S. Boyd, DRL (2)

R. H. Engelken, CO R. C. DeYoung, DRL (2)

Regional Directors, C0 D. J. Skovholt, DRL (3)

REG File P. W. Howe, DRL (2)

/O

,9910290 s,-

_ _ _ _ _. - _... _. _.... _.-.._ _ ___