Text

.

e UNITED STATES s

c,.

/

g ATOMIC ENERGY COMMISSION DIVISION OF COMPLIANCE 201 645-i ~

f' REGION I 970 BROAD STREET NEWARK. NEW JERSEY 07102 MA'f 181971 J. B. Henderson, Chief, Reactor Construction Branch, Division of Compliance, HQ METROPOLITAN EDISON COMPANY, THREE MILE ISLAND NO.1 DOCKET NO. 50-289 The enclosed report of the inspection of Metropolitan Edison Company's Three i

Mile Island Unit No. I construction site, conducted April 5 through 8, 1971, by Messrs. Hunnicutt, Howard, Tillou and Hayward, is forwarded for information.

l Two apparent. items of nonconformance were identified and a Construction Deficiency Notice forwarded to the licensee. The first nonconformance item was identified as a failure of the computer to fully route all cables contrary to the specifica-g tion and the second item was related to the separation of redundant motor control centers.

I f

The core flooding tanks originally fabricated for installation in Unit No. I have been rejecteq due to failure to meet the NDTI requirements for unrestricted service at 6-400F and 60 F as required in the FSAR.

)

One core sample hqs been compression tested and one core sample tensile pulled j

in an effort to eqtablish the concrete strength and bonding along the joint between cured concrete and concrete poured when the neasured surface temperature of the surfaces to be in contact with the newly placed concrete was below 32 F.

The compression cylinder failed at 4050 psi after nine weeks. The specified strength is 5000 psi in twenty-eight days. Met Ed does not intend to perform additional testing at this time.

^Y E.

. Howard Senior Reactor Inspector

Enclosure:

CO Report No. 289/71-2, by D. Hunnicutt, J. Tillou, W. Hayward, and E. Howard, dated 4/29/71 cc:

E. G. Case, DRS (3)

P. A. Morris, DRL R. S. Boyd, DRL (2)

R. C. DeYoung, DRL (2)

D. J. Skovholt, DRL (3)

~

P. W. Howe,. DRL (2)

.q g10 29 0fO$

A. Gimabusso, CO L. Kornblith, Jr., CO R. H. Engelken, CO Regional Directors, CO e

REG File !

1484 013

e l

~

lk U. S. ATOMIC ENERGY COMMISSION

']

REGION T.

DIVISION OF CCMPLIANCE Report of Inspection CO Report No. 289/71-2 i

Licensee:

Metropolitan Edison Company (Met. Ed.)

Three Mile Island Unit No. 1 License No. CPPR-40 Category A 3

Date of Inspection:

April 5 - 8, 1971 Date of Previous Inspectio.t:

January 18 and 19, 1971 i

inspected by:11#)h h)

[ 29-7/

D. M. Hunnicutt, Reacp6r Idspector (Principal)

Date i

G_s O

h 29-?/

E. T Howard, Senior Reactor Inspector Date i

). /./ )lh h 3-9-7/

J. H. Tillou, Reactor Inspector (Construction)

Date h.NA. %%k 2.w.t m W. M. Hayward, Reaytor Inspector (Construction)

Date Reviewed by:

f/).

I/

d-2S-7/

Y M. Howard, Senior Reactor Inspector Date Proprietary Information:

None SCOPE A routine, unannounced inspection was made of Unit No.1, one of the twc 2535 Mwt pressurized water reactors (B&W) under on Three Mile Island, near Middletown, Pennsylvania. The inspecti of the performance of the licensee-cont PI 3800/2 and included an inspection of DUPLICATE DOCUMENT Boundary Piping, Attachment G - Other C tion, Attachment I - Electrical, and a Entire document previously

. inspections.