ML19262A173

From kanterella
Jump to navigation Jump to search
Forwards Nonroutine 30-Day Rept 74-02
ML19262A173
Person / Time
Site: Crane 
Issue date: 01/15/1975
From: Arnold R
METROPOLITAN EDISON CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19262A174 List:
References
NUDOCS 7910260499
Download: ML19262A173 (2)


Text

.

AEC C:STRIBUTIC' Pott ?!.RT M CCCKET.i ATDil AL (T E.".F O,~, A R'( F O R T.:)

CONTROL NO: six 553 FILE: IrCIDENT eEror F RO:.1petroplitan Edison Co.

DATE CP CCC '

D ATE R E C'D LTP T'/!X ' R P T

CTHE, Reading, Pa 1-15 -75 1-17-75 xxx R.C. Arnold TO:

ORIG CC GTHER SENT AEC PCR xxnx SENT LCCAL POR vvvv Directorate of Licensing 1-signed CLASS UNCLASS ' PROP 17;FO it:PUT NO CYS REC'D DOCKET.0:

xxxx 1

50-289 ENCLCSURES:

DESCRi?TiCN-Ltr reporting abnornal occurrence #74-02 on -

Abnormal Occurrence #74-02 on 12-16-74 12-16-74 trans.....

concerning deficiency of design of the AC Control Rod Drive, System Trip Breaker Cabinets......

D

  • f9 'D VD

'3 h

N c

a PL ANT N AT.1E: Three Mile Island #1 FOR ACT::::':::F O R '.: A T; C ;;

1-20-75 Jca EUTLER (S)

SCITJE:;CER (S)

ZIEM/JCI (S)

REGMi (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (S)

STOLZ (S)

DICIIR (E) 1 (S)

W/ Copies W/ Copfes W/ Copies W/pCopies PARR (S)

VA$S ALIA (S)

KNIGHTON (E)

SPEIS (S)

W/ Copics W/ Copies W/ Copies W/ Copies f

ICilEL (S)

PURPLE (S)

YOUNGBI MD (E)

W/ Ccpies W/ Cop'es W/ Cooies W/ Copies ~~

INTER :AL D.;TiMCUTlC n

G.EdFILg]

TECH REVIEW DF'; TON LIC. ASST.

A/T IND

  • $Ci!RCEDER GRIIIS DIGGS (S)

ERAIT:'AN c. s._ u zo t bGC, RCCM P-306-A diACCARRY GA>0ILL GE/2IN (S)

S ALTZMaN GCUL30URNE (S)

B. liURT LDJ'trCING/ STAFF (5.:2!IGHT d.;ASTNER 4&ASE L'iA'4LICKI LALLARD KREUTZER (E)

GI4:3USS0 tfi'4!.0 SPASGLER LEE (S)

PLA.S BOYD

  • ATELLO MAIGRET (S)

MCCONALD MCORE (S) (E'.;R) dciOUSTON ENVIRO REED (E)

CHAPMA':

DEYOUNG (S) (FWR)

NCVA';

MULLEP.

SERVICE (S)

DU3E w/ir.put SKOVl:0LT (S)

DOSS DIC12R SHEPP/2D (S)

E. COUFE GOLLEP. (S) dIPPOLITO K';IG h7 0 5 SLATER (E) t/D. TEOMPSON (3)

P. COLLINS TEDESCO YOUNGLLCOD SMITH (S)

YKLECCER dLONG REGXi TEETS (S)

/F WILLI!E DENISE dAINAS PROJECT LDR WILLIN'S (C)

REG CPR t9ILE & REGION C)

I.;ENAROYA WILSON (S)

/2.R. WILSON VSTEELE EVOLI'ER HARLESS IUURAM (S)

E xi E F'. '.. m s!-': E u T:c '

'7 3 V d-LCC AL PDR ts:n--4 one-

pA (1)(2)(10)-;.ATIONAL LA25 1-PDR S AN/!.A/:7/

N -TIC ( ASERNATHY) 1-U E::I7'; TON, RM E-201 G.T.

1-BR00 LJ/E'. MAT Lfa td-NSIC (EUCH.UTX;)

1-CCNSULTJ::!::

1 G. UL11NIC:., 02:',

1 AO:2D(nr. GUss m 1-ASL3 1.IWMARK/SLC2/ /' 3A31x'

} h RM E-127 0.T.

3* ION A';DERSON y

-ACRS SEN* TO LIC, ASST.( g h 1-J. RUNRLES, RM E-2:

G.T.

7 U026o g y

ifMJ

~~

7 n.:

n.oro me **xorss

n..r METROPOLITAN EDISON COMPANY PCST CFFICE SCX 542 RE ACING. PENNSYLV ant A 19603 TELEPHCNE 215 - 9 3 601

- A 1 5 575

~;-~.

Directorate of Licensing

/xy

,' s Directo r f 9,m, U. S. Atomic Energy Comission

/gf fj-[.

%/ 7y

'4ashington, D.C. 20545 g bl{,/~ kg. -

J

~~

'9; 6;

Mr. J. P. O'Reilly, Director Directorate of Regulatory Operations-Region 1 U. S. Atomic Energy Comission h'7-631 Park Avenue King of Prussia, Pennsylvania 19406 N..,

Dear Sirs :

Docket No. 50-289 Operating License No. DPR-50 Nonroutine 30-Day Report 74-02 In accordance with the requirements of 6.7.2.b of the Technical Specifications for our Three Mile Island Nuclear Station Unit 1 (TMI-1), we are submitting this nonroutine 30-day report. The report deals with a deficiency of design of the AC Control Rod Drive System Trip Breaker Cabinets which was deternined to exist on December 16, 1974, as a result of discussions with the vendor and archi te ct-engine e r.

'de trus t that this submittal satisfies the reporting requirements referenced above and adequately answers any concerns you may have.

Sincerely, n-I

-l i

Vice President RCA:RSB :tas Enclosure : Nonroutine 30-Day Repe rt 74-02

}4h File:

20.1.1/7.7.3.6.1 55'