ML19262A172

From kanterella
Jump to navigation Jump to search
ForwardsBulletin 74-10, Failures in 4-Inch Bypass Piping at Dresden-2. No Action Required.W/O Encl
ML19262A172
Person / Time
Site: Dresden, Crane  
Issue date: 09/19/1974
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
References
NUDOCS 7910260498
Download: ML19262A172 (1)


Text

.

a g,

UNITED ST ATES c

n ATOMIC ENERGY COMMISSION

[

'r]

osarcTou ait or stGuLA Tom e OPE R A TsoNs

/

{, N L _.s ntcsom e IO 631 P ARM AVENUE KING or PRUSSI A. PENNSYLV ANI A

",,,',,, /

9 19406 September 19, 1974 Metropclitan Edison Company Docket No. 50-289 Attention.

R. C. Arnold Vice President P. O. Box 542 Reading, PA 19603 Gentlemen:

Enclosed is R0 Bulletin 74-10 which is forwarded for your information.

No action is requested cf you if you do not have a boiling water reactor (BWR) facility with an operating license.

Should you have questions regarding this Bulletin, please contact this office.

Sincerely, d

James P. O'Reilly g

Director

Enclosure:

R0 Bulletin 74-10 J. G. Herbein, Station Superintendent cc:

R. W. Heward, Project ibnager, CPUSC

~

wu===

n a n -

ZZZ~-- ~ l' bec: R0 Files

/ DR Central Files PDR Local PDR Reg. Reg. Rdg. Ib.

State of Pennsylvania occ gg 9 7910260

  1. /$