ML19262A135

From kanterella
Jump to navigation Jump to search
Extends safety-related Print Revision Date from 790914 to 1201 in Response to IE Insp Rept 50-324/79-02
ML19262A135
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/14/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
GD-79-2305, NUDOCS 7910260414
Download: ML19262A135 (1)


Text

TIC l

" C - % '!

CaN9EOefW* ;, Light Company

.$M;r'e't14,1979' a

.~

Septemb E 'Y? l8 A 9 : g g FILE: NG-3513(B)

SERIAL: GD-79-2305 Mr. James P. 0'Reilly, Director U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 & 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 SUPPLEMENT TO RESPONSE TO IE INSPECTION REPORT 324-325/79-02

Dear Mr. O'Reilly:

In our supplemental response to IE Inspection Report 324-325/79-02 on August 1, 1979, Serial Number GD-79-1967, we committed to having all safety-related prints, both frequently and infrequently used, revised by September 14, 1979.

Due to the increased work load of UE&C created by TMI, seismic analyses, and anchor bolt inspections, their projected completion dates have slipped. All completed modifications will have their prints revised by December 1; 1979. All incomplete plant modifications will have their associated prints revised in a timely manner upon notification of their completion.

Yours very truly, su hv H. R. Banks Manager Nuclear Generation RMP:CSB:j mb*

1H 7 149 7910260 F

411 Fayetteville Street e P. O. Box 1551

  • Raleigh, N. C. 27602

.4

-~

M OMXTALCOPv