ML19262A016
| ML19262A016 | |
| Person / Time | |
|---|---|
| Site: | Hartsville |
| Issue date: | 09/18/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19262A006 | List: |
| References | |
| NUDOCS 7910260142 | |
| Download: ML19262A016 (2) | |
See also: IR 05000518/1979019
Text
~[W
'
[gare
UNITED STATES
[6 -d/f
o,,
NUCLEAR REGULATORY COMMISSION
gpp
g
a
REGION 11
gg
0,%
b[
101 MARtETTA ST N.W SUITE 3100
ATLANTA, GEORGIA 303o3
6d/
o
-SEP 181979
In Reply Refer To:
RII:WBS
50-518/79-19
+
50-519/79-19
50-520/79-19
50-521/79-19
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by W. B.
Swan of this office on
August 20-24, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-150, CPPR-151, CPPR-152, and CPPR-153 for the Hartsville Nuclear Plants
facility, and to the discussion of our findings held with W. R. Brown at the
conclusion of the inspection.
Ateas examined duriag the inspection and our findings are discussed in the
enclosed inspection ceport.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observacions by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be' prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
_ . .
,
_.
1216
188
7 9102 6 0 It L
$iP . L 1979
.
. . . . . . ,
Tennessee Valley Authority
-2-
,
Should you have any questions concerning this letter, we will be glad to discuss
t'.:m with you.
Sincerely,
.
i
C. E. Murphy, Chie
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspeciion Report Nos. 50-518/79-19,
50-519/79-19, 50-520/79-19, .nd 50-521/79-19
cc w/ enc 1:
R. T. Hathcote, Project Manager
P. O. Box 2000
Hartsville, TN 37074
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, Tennessee
37902
J. E. Wills, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
/
-- .
.
.,
1216
189