ML19261F346

From kanterella
Jump to navigation Jump to search
Terminates Requirement for Monthly Procedure Change Progress Repts,Item 6 of IE Bulletin 75-04A
ML19261F346
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/04/1977
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
References
NUDOCS 7910250805
Download: ML19261F346 (1)


Text

a 4

cf 4,

UNITED STATES

[..

NUCLEAR REGULATORY COMMISSION j j ' #i j

REGloN l

' c 631 P ARK AVENUE e.

[

KING OF PRV$51 A PENNSYLV ANI A 19406 January 4, 1977 Metropolitan Edison Company Docket No. 50-289 Attention:

Mr. R. C. Arnold Vice President P. O. Box 542 Reading, Pennsylvania 19603 Gentlemen:

Item 6 of IE Bulletin 75-04A required monthly progress reports for incomplete procedure changes and facility modifications resulting from the fire protection and emergency shutdown procedure reviews which were conducted following the Browns Ferry fire.

Fire protection reviews are now being handled by the Office of Nuclear Reactor Regulation (NRR) in accordance with Appendix A to Branch Technical Position 9.5-1.

The changes related to emergency shutdown are either complete or the completion schedule has been established. For these reasons, the require-for progress reports in IE Bulletin 75-04A, Item 6 is hereby terminated.

ment Sincerely, h

James P. O'Railly Director cc:

J. G. Herbein, Manager, Generation Operations - Nuclear R. W. Heward, Project Manager, CPUSC Miss Mary V. Southard, Chairman, Citizens for a Safe Environment beer II Mail & Files (For Appropriate Distribution)

/ Central Files Public Document Roca (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Technic'T Information Center (TIC)

REC:I Fa= ding Room Commonwealth of Pennsv1vania

~

1482 0 Mn 7910250 0~