RO 77-23/1P:on 770920,containment Integrity Violated When Both Doors in Reactor Bldg Personnel Access Hatch Were Open for Approx 10 Minutes.Caused by Problem W/Door Interlock. Interlock & Door Seals Tested
ML19261F312
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/20/1977
From: Ohanlon J
METROPOLITAN EDISON CO.
To:
References
NUDOCS 7910250773
Download: ML19261F312 (2)


Text

. .. ,

c a vr.e.n m as s -

i M

.- =: - _ . ,

, METROPOLITAN EDISON COMPANY 9 ,-

POST OFFICE BOX 480 MIDDLETOWN pENNSYLV ANIA 1/C5 7 TELEPHONE 717.044.80 11 20 September 1977 Mr. Royce H. Grier Directorate of Regulatory Operations Region I Nuclear Regulatory Comissfon 631 Park Avenue King of Prussia, Pennsylvania 19406 Operating 1.icense DPR-50 Docket 50 289

Subject:

Reportable Occurrence No. 77-23/1P

Dear Mr. Grier:

This telegram is to confim the telecon between Mr. C. E. Hartman (THI-I Engineer III - Nuclear) and Mr. P. J. Kellogg (Region I - NRC) at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on 20 Septer:ber 1977.

A violation of the Technical Specification 3.6.1 occurred in that containment integrity was not maintained while the Reactor Coolant System

.was at 550 psig and 3500F.

At 1124 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.27682e-4 months <br /> or. 20 September 1977, while an employee was exiting the Reactor Building, both doors in the Personnel Access Hatch were open for approximately ten (10) minutes.

Irranediate corrective action was taken to shut the inner door from inside the Reactor Building. Af ter correcting the door interlock position, the outer door was closed. The door interlock function was then satisfactorily tested. In addition, a leak check on the door seals was satisfactorily per-fomed.

A more detailed evaluation as to the cause of this incident, and any long tem corrective action which may be necessary will be discussed in 7910250 7 7 3 .@

1482 027

-. _~_ . .. . . - -

Mr. Boyce H. Grier 20 September 1977 the follow-up report.

Very truly yotars, q9 &