ML19261F262

From kanterella
Jump to navigation Jump to search
Forwards LER 78-003/03L-0
Date released: 10/02/2019 Download: ML19261F262


LER 78-003/03L-0:on 780112,emergency Diesel Generator 1B Failed to Start on Simulated Test Signal During Procedure SP1305-5.2.Caused by Drifting Oil Pressure Limit Switch. Setting Adjusted,New Limit Switch Ordered
ML19261F263
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/03/1978
From: Herbein J
METROPOLITAN EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19261F263 (2)
Forwards LER 78-003/03L-0
ML19261F261
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/03/1978
From: Herbein J
METROPOLITAN EDISON CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19261F261 (2)