ML19261F149
| ML19261F149 | |
| Person / Time | |
|---|---|
| Site: | Hartsville |
| Issue date: | 09/04/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19261F150 | List: |
| References | |
| NUDOCS 7910250214 | |
| Download: ML19261F149 (2) | |
See also: IR 05000518/1979015
Text
b
.
o,,
UNITED STATES
h
+
NUCLEAR REGULATORY COMMISSION
87
[
)
g
'
E
E
REGION ll
$d
8,
p
101 MARIETTA ST., N.W., SUITE 3100
D
ATLANTA, GEORGIA 303o3
[
%,***** ,o
In Reply Refer To:
RII:WBS
SEP 0 41979
50-518/79-15
50-519/79-15
50-520/79-15
50-521/79-15
Tennessee Valley Authority
Attn:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by W. B. Swan of this office on
July 23-27, 1979 of activities authorized by NRC Construction Permit
Nos. CPPR-151, CPPR-152 and CPPR-153 for the Hartsville Nuclear Plant
facility, Unit Nos. A1, A2, B1 and B2, and to the discussion of our
findings held with R. T. Hathcote at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
}w2})
'77
,,J
,
7 910 2 5 0 M
.'
Tennessee Valley Authority
-2-
SEP 0 41979
'
in a separate part of the document.
If we do not hear from you in this
'
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
.
Sincerely,
C. E. Murphy, hief
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-518/79-15,
50-519/79-15, 50-520/79-15 and
50-521/79-15
cc w/ enclosures:
R. T. Hathcote, Project Manager
Post Office Box 2000
Hartsville, Tennessee 37074
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, Tennessee 37902
J. E. Wills, Project Engineer
400 Chestnut Street Tower II
Chattanooga, Tennessee 37401
1 [q ] '5
? 7=
l $
I
't
.
t