ML19261E889
| ML19261E889 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/02/1970 |
| From: | Heishman R, Howard E, Hunnicutt D US ATOMIC ENERGY COMMISSION (AEC) |
| To: | |
| Shared Package | |
| ML19261E880 | List: |
| References | |
| 50-289-70-05, 50-289-70-5, NUDOCS 7910170946 | |
| Download: ML19261E889 (3) | |
Text
a U. S. ATOMIC ENERGY CCMMI.sSION REGION I DIVISION OF COMPLDNCE Repcrt of Inspection C0 Report Nos. 289/70-3 320/70-4 1.a nsee:
Metropolitan Edison Company (Met Ed)
(Three Mile Island Uaits No. 1 and 2)
License Nos. CPPR-40 and CPPR-66 uate of Inspection:
June 18, 1970 Date of Previous Inspection:
May 26-28, 1970 Inspected by:
'ht & & f-7/4 /70 D. M. Hunnicutt, Reactor Inspector (Principal)
' Ddte Y"/ 00
~
R. F. Heishman, Reactor Inspector Date Reviewed by:
J 6f T
7[ / 70~
E. M. Howard, Senior Reactor Inspector
'Date Proprietary Information:
NONE SCOPE The purpose of this management meeting was to discuss with Met Ed and B&W tM comments and findings obtained during the 3&W QA inspection (C0 Report Nor.
289/70-3 and 320/70-3). The meeting was held in the 36W office, Lynchburg, Virginia.
The significant findings of the inspection were reviewed with Met Ed and B&W corporate and staff personnel.
The specific areas of concern were discussed in detail by Mr. Heishman. B&W and Met Ed were responsive to the C0 comments and indicated that corrective action would be initiated at the earliest date practical.
A.
Meeting Attendees 1483 104 BsW W. H. Rawand, Vice President and General Manager, NPGD H. F. Dobel, Manager, QA R. E. Braumiller, QA Representative s
E. G. Ward, Project Manager, TMI 1 and 2 D. W. Ment:;omery, Manager, Nuclear Systems Engineerin 0170 C. R. Powers, QA Representatire jh