ML19261E756
| ML19261E756 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 06/29/1979 |
| From: | Rosalie E NORTHWEST ENVIRONMENTAL ADVOCATES (FORMERLY COALITION |
| To: | |
| Shared Package | |
| ML19261E757 | List: |
| References | |
| NUDOCS 7908300758 | |
| Download: ML19261E756 (2) | |
Text
==
TR W ;'
L,'
g, REIATED CORRESPONDRNCE N
UNITED STATES OF AMERICA 6'
.. c,
3,
. 1 NUCLEAR REGULATORY COMMISSION 6-gt s
..y
.,..c c..c. s
{,h O kf*'
BEFORE THE ATOMIC SAFETY AND LICENSING BOA
%.77Yad#
y y.
In the Matter of
)
)
PORTLAND GENERAL ELECTRIC COMPANY,
)
Docket No. 50-344 et al.
)
~
)
(Control Building Proceeding)
(Trojan Nuclear Plant)
)
)
SUPPLEMENTAL RESPONSE TO LICENSEE'S SECOND SET OF INTERROGATORIES TO EUGENE ROSOLIE, PRO SE, AND COALITION FOR SAFE POWER Interrogatory 13 (c) (L)
Date of Report LER Number Date of Report LER No.
3-08-77 77-02 4-20 -77 77-06 6-0 3-77 77-12 6-03-77 77-13 6-17-77 77-16 7-23-77 77-23 8-10-77 77-26 8-26-77 77-31 11-10-77 77-39 2-04-78 78-01 2-10 -78 78-03 3-14-78 78-06 4-05-78 73-07 3-30-78 78-08 3-31-78 78-09 6-15-78 78-10 5-19-78 73-15 6-07-78 78-18 8-14-78 78-23 8-15-78 78-24 10-25-78 78-25 12-26-78 78-26 12-29-78 78-27 1-28-79 78-28 1-29-79 78-29 2027 031 Interro gatory 14 (a) (i) 1-process steam feedwater pipe at elevation 45ft. Bushnell (PGE) 2-fire protection piping at elevation 45 f t. Bushnell (PCE) 3-PCE 1020 has alot of detail missing. Worth Edwards (Bechtel) 4-uncontrolled access by workers to safety related equipment areas. This was obtained from a conversation with NRC perscnnel and PGE.
5-embedded conduits for safety related equipment could be af fected by f alling plate. No evaluation done. Once again the source was a conversatiori between NRC and PGE.
6-Cables DFB-188 and DI-1015, safety related at elevation 93ft. in the Nuclear Instrumention Room, are in the line of drill. This information was obtained by personal observation.
7-supply transformer from RDMG to Rod Controls fixed to eastside of Control building wall at elevation 65ft. Once again this was personal observation.
790830 @
aus.m,
4 8-safety related cables near east wall of control building at elevation 65f t.
Personal observation 9-effects of drilling holes as to vibracion, dust and noise not known. Edwards Interrogatory 15 (a) Basis is contained in response to interrogatories 13 and 14..
(b) (i) No.
(ii) We do not believe Licensee can make an adequate showing.
(ir_) The reason for the above response is all the information we have been able to obtain to date fro 1 Licensee and NRC Staff.
(c) (1) (ii) See response to interrogatory 14.
In response to Licensee's interrogatory 7 the only conclusion was that certain information was missing from PCE 1020. Our site visits showed that the information was still not available or h d changed.
If the information is not supplied to us we can not share such information. Since the Licensee has the information and the burden of proof in this case Licensee should provide t'.at information.
(d) See interrogatory 14 Interrogatory 16 See response to interrogatory 14 (a) (i) and 15 (c) (L) (ii).
Interrogatory 17 See response to Staff's interrogatory C,20-4.
Interrogatory 18 (a) The information was no information.
(c) Testimony of Holley and Bresler Tr. 1024-1046,1427-1613 and 1729-1790.