ML19261E321

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-304/79-04 on 790312-13 & 790403-04 & Notice of Violation
ML19261E321
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 04/18/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19261E322 List:
References
NUDOCS 7907050549
Download: ML19261E321 (2)


See also: IR 05000304/1979004

Text

T"

d?n,

'

.

"

>

.

n= TIC

a afc

i

[n

o4

UNITED STATES

4,

O

.'t

N UC LE A R REGULATORY COMMISSION

f, *(I

l_

I

REGloN lli

..g*

P,f

799 RooSE v E LT ROAD

.

G LE N E LL Y N. IL LINols 60137

.....

APR 1 b 1979

Docket No. 50-304

Cor onwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. W. J. Key of this

office on March 12-13 and April 3-4, 1979, of activities at Zion

Nuclear Generating Station, Unit 2, authorized by NRC Operating

License No. DPR-48 and to the discussion of our findings with

Mr. h.

E. Wandke and others of your staff at the ccnclusion of the

inspection.

The enclosed ce sy

>f our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

pcrsonnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code

of Federal Regulations.

Section 2.201 requires you to submit to

this office within thirty days of ycur receipt of this notice a

written statement or explanation in reply, including for each

item of noncompliance: (1) corrective action taken and the results

achieved; (2) corrective action to be taken to avoid further non-

compliance; and (3) the date when full compliance vill be achieved.

%

79070505'll

m

,

,,3

Yo

!f

.

Commonwealth Edison

- 2-

APR 181979

Company

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter,

the enclosures, and your response to this letter will be placed in

the NRC's Public Document Room, except as follows.

If the enclosures

contain information that you or your contractors believe to be pro-

prietary, you must apply in writing to this office, within twenty

days of your receipt of this letter, to withhold such information

from public disclosure. The application must include a full state-

ment of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in

the application is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

.

pu'

-

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-304/79-04

cc w/encls:

Mr. N. Wandke, Plant

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

l}

(