Text
/C
.
.
,
d
%
UNITED STATES
j
&
&
NUCLEAR REGULATORY COMMISSION
f
'
631 PARK AVENUE
- l
REGION 1
- '%
'C
KING OF PRUSSI A. PENNSYLVANI A 19406
.
.....
Docket No. 50-423
fd2 2 4 W9
Northeast Nuclear Energy Company
ATTN:
Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. 0. Box 270
Hartford, Connecticut
06101
Gentlemen:
Subject:
Inspection 50-423/79-02
This refers to the inspection conducted by Mr. A. Toth of this office on
March 13-15, 1979 at the Millstone Nuclear Power Station, Unit 3, at
Waterford, Connecticut of cctivities authorized by NRC License No. CPPR-
113 and to the discussions of our findings held by Mr. Toth with Mr. G.
Johnson and Mr. S. Toth of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these creas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, ac.d observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure.
Any such application must be accompanied by an
affidavit executed by the owner of the information, which idantifies the
document or part sought to be withheld, and which contains a statement
of rcasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
f2 5
f
90
q
.
c d /. . ;
7907 050
.4
wm
.
.
Northeast Nuclear Energy Company
2
No reply to this letter is required; however, should you have any ques-
tions concerning this inspection, we will te pleased to discuss them
with you.
Sincerely,
h
A
, Robert T. Carlson, Chief
.
Reactor Construction and Engineering
Support Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-423/79-02
cc w/ encl'.
K. W. Gray, Construction Quality Assurance Lead
H. R. Nims, Director of Nuclear Projects
J. F. Opeka, Station Superintendent
J. R. Himmelwright, Licensing Safeguaris Engineer
N 2.') l-]