ML19261E299

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-423/79-02 on 790313-15.No Noncompliance Noted
ML19261E299
Person / Time
Site: Millstone 
Issue date: 04/24/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19261E300 List:
References
NUDOCS 7907050525
Download: ML19261E299 (2)


See also: IR 05000423/1979002

Text

/C

.

.

,

d

%

UNITED STATES

j

&

&

NUCLEAR REGULATORY COMMISSION

f

'

631 PARK AVENUE

  • l

REGION 1

  • '%

'C

KING OF PRUSSI A. PENNSYLVANI A 19406

.

.....

Docket No. 50-423

fd2 2 4 W9

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. 0. Box 270

Hartford, Connecticut

06101

Gentlemen:

Subject:

Inspection 50-423/79-02

This refers to the inspection conducted by Mr. A. Toth of this office on

March 13-15, 1979 at the Millstone Nuclear Power Station, Unit 3, at

Waterford, Connecticut of cctivities authorized by NRC License No. CPPR-

113 and to the discussions of our findings held by Mr. Toth with Mr. G.

Johnson and Mr. S. Toth of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these creas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, ac.d observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure.

Any such application must be accompanied by an

affidavit executed by the owner of the information, which idantifies the

document or part sought to be withheld, and which contains a statement

of rcasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

f2 5

f

90

q

.

c d /. . ;

7907 050

.4

wm

.

.

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any ques-

tions concerning this inspection, we will te pleased to discuss them

with you.

Sincerely,

h

A

, Robert T. Carlson, Chief

.

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-423/79-02

cc w/ encl'.

K. W. Gray, Construction Quality Assurance Lead

H. R. Nims, Director of Nuclear Projects

J. F. Opeka, Station Superintendent

J. R. Himmelwright, Licensing Safeguaris Engineer

N 2.') l-]