Forwards IE Circular 79-11, Design/Const Interface Problem. No Action Required
ML19261E260
Person / Time
Site: Marble Hill
Issue date: 06/27/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Coughlin J
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
References
NUDOCS 7907050480
Download: ML19261E260 (1)


Text

[paarc, o

'o UNITED STATES l '},., J' )

NUCLEAR REGULATORY COMMISSION c

REGION 111 o,

h

[

799 ROOSEVELT ROAD f

GLEN E LLYN ILLINOls 60137 o

i,,

JUN 2 ? 1979 Docket No. 50-546 Docket No. 50-547 Public Service of Indiana ATTN:

Dr. James Coughlin Vice President, Nuclear 1000 East Main Street Plainfielo, IN 46168 Gentlemen:

The enclosed Circular No. 75 4

, is forwardad to you for information.

No written response to this Circular is required.

If you require additional information regarding this subject, please contact this office.

Sincerely, zu bO.

f James G. Keppler Director

Enclosure:

IE Circular No. 79-11 cc w/ enc 1:

Mr. R. M. Brown, Construction Project Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC LeBoeuf, Lamb, Leiby & MacRae 291 jo;7 0so FF o g) 7907

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT o

REGION III June 27, 1979 IE Circular No. 79-11 DESIGN / CONSTRUCTION INTERFACE PROBLEM Description of Circumstances:

Apparent inadequate cor=unication between nuclear steam supply system (NSSS),

architect / engineer (A/E) and constructors have resulted in reveral cases where reactor vessels or the supports have been misoriented. The misorienta-tion problems appear to occur at sites where dual reactor units are being constructed and one primary system layout is a mirror image of the other.

In 1975 TVA reported a misorientation problem with the Sequoyah Unit 2 reactor vessel.

Westinghouse was the NSSS supplier and TVA provided their own A/E service.

In 1977 the Southern California Edison Company reported a reactor vessel misorientation at San Onofre Unit 2.

Combustion Engineering was the NSSS supplier and Bechtel provided the A/E service.

In 1979 the Texas Uti'.ities Generating Company reported a reactor vessel support system misorientation at Comanche Peak Unit 2.

Westinghouse supplied the NSSS, Gibbs and Hill was the plant engineer and Brown and Root was the constructor.

Even though there appears to be minimal safety implications associated with the particular misorientation problems mentioned, repetition of the same type of errors suggests breakdowns in the design / construction interface relation-ships that could in turn lead to more significant safety problems.

Corrective preventive action is recommended for the following reasons:

If the interface control system between the NSSS/AE/ Construction is marginal or ineffective as evidenced by the misorientation of reactor vessels and their supports, it is possible that other safety related equipment may also be misoriented and/or mislocated.

In some cases the errors ray not be as obvious as a misoriented reactor vessel.

This type of error can and has resulted in hardware modifications and could cause functional and/or structural changes that affect design and operating parameters.

In translating NSSS design info g]j

1. -

m-~~=

m -

~~a 3 the A/E may make changes to faci DUPLICATE DOCUMENT plant.

These translations may ay h Fntire document previously entered 4 into system under: