ML19261E150
| ML19261E150 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 05/03/1979 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML19261E151 | List: |
| References | |
| NUDOCS 7907050191 | |
| Download: ML19261E150 (2) | |
See also: IR 05000298/1979007
Text
~/
/{
[pm arcq
UNITED STATES
o
NUCLEAR REGULATORY COMMISSION
,', E
[V
o
REGION IV
5.
611 RYAN PLAZA DRIVE, SUITE 1000
!
%,, '
f
o
~
May 3, 1979
In Reply Refer To:
Docket lio. 50-298/79-07
fiebraska Public Power District
ATTri: Mr. J. M. Pilant, Director
Licensing and Quality Assurance
P. O. Box 499
Columbus,fiebraska 68601
Centlemen:
This refers to the inspection conducted by Messrs. L. D. Gilbert and
D. P. Tomlinson of this office during the period April 16-19,1979, of
activities authorized by tiRC Operatin9 License DPR-46, and to the
discussions of the findings with Mr. L. C. Lessor.
Principal areas examined during the inspection included: review of
Quality Assurance Program and nondestructive examination procedures and
observation of work activities for inservice inspection.
Within the scope of this inspection, no items of noncompliance or deviations
were identified.
In accordance with Section 2.790 of the tiRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the tiRC's Public Document
Room.
If this report contains any information that you or your centractors
believe to be proprietary, it is necessary that you make a written applica-
tion within 20 days to this office to withhold such information from public
disclosure. Any such application must include a full statement of reasons
on the basis of which it is claimed that the information is proprietary
and should be prepared so that the proprietary information identified in
the application is contained in a separate part of the document.
If we do
not hear from you in this reg'rd within the specified period, the report
will be placed in the Public Document Room.
o % C)
_ ,,
L. \\
.
7 9 7 050 lW
q)
0
y;l(
fiebraska Public Power District
-2-
May 3, 1979
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
Ta $aUl& & h
G. L. Madsen, Chief,
Reactor Operations and
fluclear Support Branch
Enclosure:
IE Inspection Report No. 50-298/79-07
cc w/ enclosure:
L. C. Lessor, Superintendent
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska 68321
.
n-
.,
f
-