ML19261D448

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for May 1979
ML19261D448
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/12/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19261D449 List:
References
NUDOCS 7906190258
Download: ML19261D448 (1)


Text

s A.3Daf*a Power Cctoary 600 Nor n f 8'n Street Post Cece Ebs 2641 B<rminram. A'aca. a 35291 Te.er?one 205 323-5341 L

F. L CLAYTON, JR Alabama power Sertor Vice P'esicent

ve scurrem e ect : sis:em June 12, 1979 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 RE: Joseph M. Farley Nuclear Plant Unit No. 1 Docket No. 50-348 Monthly Operating Data Report Deat Sir:

Attached are two (2) copies of the April, 1979 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Sec-tion 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly,

/[

F. L. Clayton, Jr.

FLCJr/ KAP:bhj Attachment 2307 205 cc: Director, IE (10 copies)

Director, RII (1 copy)

Mr. Ted Cintula (1 copy) hot S //

7906190MW