ML19261D085
| ML19261D085 | |
| Person / Time | |
|---|---|
| Issue date: | 03/19/1979 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Jacobi W WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| Shared Package | |
| ML19261D080 | List: |
| References | |
| REF-QA-99900404 NUDOCS 7904270132 | |
| Download: ML19261D085 (2) | |
Text
[s>m meGug UNITED STATES o,
NUCLE AR REGULATORY COMMISSION
[
REGION IV 3[Y3 7(
e
.1 611 RYAN PLAZA DRIVE,SulTE 1000 8
o,.,s.2 ARLINGTON, TEXAS 76011
. 7..
19 MAR 7379 Docket No. 99900404/79-01 Westinghouse Electric Corporation ATTN:
Dr. W. M. Jacobi, General Manager Nuclear Technology Division Post Office Box 355 Pittsburgh, Pennsylvania 15230 Gentlemen :
This refers to the QA Program Inspection conducted by Mr. D. G. Anderson of this office on March 6-9, 1979, of your facility at Monroeville, Pennsylvania, and to the discussions of our findings with Mr. E. S. Hampton and members of your staff at the conclusion of the inspection.
Areas examined during the QA program inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During this inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within thirty (30) days a written statement containing, (1) a description of steps that have been or will be taken to correct this item, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the dates your corrective actions and preventive measures were or will be completed.
In accordance with Section 2.790 of the Commission's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply together with the encic, sed inspection report will be placed in the Commission's Public Document Room.
If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such infomation from public disclosure.
Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so'that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
790427o a L
Westinghouse Electric Corporation Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,.r,
\\s (b% \\
v byO Uldis Potapovs, Chie f Vendor Inspection Branch
Enclosures:
1.
flotice of Deviation 2.
Inspection Report flo. 99900404/79-01 D