ML19261C730

From kanterella
Jump to navigation Jump to search
Forwards LER 79-013/03L-0
Date released: 10/02/2019 Download: ML19261C730


LER 79-013/03L-0 on 790227:B1F Sequencer Found in Test Mode, Rendering 1-2A Diesel Generator Inoperable.Caused by Faulty Switch Mechanism.Sequencer Repaired
ML19261C733
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/22/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19261C733 (1)
Forwards LER 79-013/03L-0
ML19261C729
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/22/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19261C729 (1)