ML19261C344

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Amend 10 to License NPF-2
ML19261C344
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/02/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19261C341 List:
References
NUDOCS 7903220301
Download: ML19261C344 (2)


Text

.

7590-01 UNITED STATES NUCLEAR REGULATORY D 'fCSSIO" DOCKET NO. 50-348 ALABAMA POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OFERATING LICENSE The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No.10 to Facility Operating License No. NPF-2, issued to Alabama Power Company (the licensee), which revised Technical Specifications for operation of the Joseph M. Farley Nuclear Plant, Unit No.1 (the facility) located in Houston County, Alabama.

The amendment revises the Technical Specifications relating to:

(1) radial peaking factor limits as a function of core height; (2) setpoint for a reac, tor trip following a turbine trip; (3) part length control rods which will be removed from the reactor during the first refueling outage; and (4) addition of a Maintenance Superintendent.

Revisions 1 and 4 above are effective as of the date of issuance of this amendment. Revisions 2 and 3 above will be effective upon startup after fueling for Cycle 2.

The application for the ar.2ndment complies with the standards ~

and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Comission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

Tjo37&o30l

7590-01 2-Tiie Comission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the application for amendment dated November 15, 1978, supplemented by letters dated December 21, 1978 and January 12, 1979, (2) Amendment No.10 to License No. NPF-2, and (3) the Comission's related Safety Evaluation. All of these items are available for public inspection at the Comission's Public Document Room,1717 H Street, N. W., Washington, D. C. and at the Gdorge S. Houston Memorial Library, 212 W. Vurdeshaw Street, Dothan, Alabama 36301. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D. C.

20555, Attention:

Director, Division of Operating Reactors.

Dated at Bethesda, Maryland, this 2nd day of March,1979.

FOR THE NUCL AR REGULATORY COMMISSION 4

08ddlV A. Schwencer, Chief Operating. Reactors Branch #1 Division of Operating Reactors