Forwards IE Insp Rept 50-358/79-01 on 790123-26 & Notice of Violation
ML19261C210
Person / Time
Site: Zimmer
Issue date: 03/05/1979
From: Fioirelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
Shared Package
ML19261C211 List:
References
NUDOCS 7903200189
Download: ML19261C210 (2)


See also: IR 05000358/1979001

Text

T

.

_

UNITED STATES

M

p** "'%

,,

NUCLEAR REGULATORY COMMISSION

. , . -

4

'

f'[p

y

l

REGION ill

799 noosevetr noAo

j

e

GLE N E LLYN, lLLINolS 60137

. ,

<,

Y!.P. -5.1979

Docket No. 50-358

Cincinnati Gas and Electric

Company

ATTN:

Mr. Earl A. Borgmann

Vice President Engineering

139 East 4th Street

Cincinnati, OH 45201

Gentlemen:

This refers to the inspection conducted by Messrs. H. M. Wescott,

C. M. Erb, P. Barrett, and '

w ghes of this office on January 23-

.u

26, 1979, of activities at W . H. Zimmer Nuclear Power Plant

authorized by NRC Construction Permit No. CPPR-88 and to the

discussion of our findings with Messrs. B. Culver, W. Schwiers,

J. R. Schott and others at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the inspection

consisted of a selective examination of procedures and represen-

tative records, observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be

in noncompliance with NRC requirements, as described in the

enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code

of Federal Regulations. Section 2.201 requires you to submit

to this oft.ce within twenty days of your receipt of this notice

a written statement or explanation in reply, including for each

item of noncompliance: (1) corrective action taken and the

results achieved; (2) corrective action to be taken to avoid

further noncompliance; and (3) the date when full compliance will

be achieved. The inspection showed that action had been taken to

correct item 4.b of Appendix A and to prevent recurrence. Conse-

quently, na reply to item 4.b is required and we have no furhter

questions regarding this matter at this time.

..

790ggo9,g1

.

_

.

Cincinnati Gas and

-2-

pp _g 97j

Electric Company

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter, the enclosures, and your response to

this letter will be placed in the NRC's Public Document Room,

except as follows.

If the enclosures contain information

that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of

your receipt of this letter, to withhold such information

from public disclosure. The application must include a full

statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so.that proprietary

information identified in the application is contained in an

enclosure to the application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

\\

/4"ZM

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1. Appendix A, Notice

of Violation

2. IE Inspection Report

No. 50-358/79-01

cc w/ encl's:

Mr. J. R. Schott, Plant

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

U. Young Park, Power

Siting Commission

  • .